grepcent public filings, reorganized for comparison

AST SpaceMobile, Inc. (ASTS) FY 2023 MD&A

Verbatim Item 7 Management's Discussion and Analysis from AST SpaceMobile, Inc.'s 10-K for fiscal year 2023. Filing date: 2024-04-01. Report date: 2023-12-31. Accession: 0000950170-24-039342.

This page reproduces the company's own Item 7 MD&A text from the linked SEC filing. It is filer text, not grepcent analysis, scoring, or investment advice.

Extracted structurally from real Item 7 body heading to real Item 7A/8 boundary. Confidence: high.

Company profile: ASTS · All MD&A years: index · Previous year: FY 2022 · Next year: FY 2024

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Except as otherwise noted or where the context requires otherwise, references in this report (the “Annual Report”) to “we,” “us” or the “Company” refer to AST SpaceMobile, Inc. and references to our “management” or our “management team” refer to our officers and directors.

The following discussion and analysis of the Company’s financial condition and results of operations should be read in conjunction with our consolidated financial statements and notes thereto included in Item 8 - Financial Statements and Supplementary Data of this Annual Report on Form 10-K for the year ended December 31, 2023, including our consolidated financial statements and related notes contained therein. Unless otherwise indicated, all references to “dollars” and “$” in this Annual Report are to, and all monetary amounts in this Annual Report are presented in, U.S. dollars.

Overview

We are building the first and only global Cellular Broadband network in space to be accessible directly by everyday smartphones (2G/4G-LTE/5G devices) for commercial use, and other applications for government use utilizing our extensive intellectual property (“IP”) and patent portfolio. Our SpaceMobile Service is being designed to provide cost-effective, high-speed Cellular Broadband services to end-users who are out of terrestrial cellular coverage using existing mobile devices. The SpaceMobile Service currently is planned to be provided by a constellation of high-powered, large phased-array satellites in Low Earth Orbit (“LEO”) using low band and middle band spectrum controlled by Mobile Network Operators (“MNOs”). We are headquartered in Texas where we operate 185,000 square feet satellite assembly, integrating and testing (“AIT”) facilities. Our IP portfolio is diverse, containing numerous and various innovations of the direct-to-cell satellite ecosystem from space to Earth. Our IP portfolio consists of 36 patent families worldwide. As of December 31, 2023, we had more than 3,350 patent and patent pending claims worldwide, of which approximately 1,050 have been officially granted or allowed.

We intend to work with MNOs to offer the SpaceMobile Service to the MNOs’ end-user customers. Our vision is that users will not need to subscribe to the SpaceMobile Service directly through us, nor will they need to purchase any new or additional equipment. Instead, users will be able to access the SpaceMobile Service when prompted on their mobile device that they are no longer within range of the land-based facilities of the MNO operator or will be able to purchase a plan directly with their existing mobile provider. We intend to seek to use a revenue-sharing business model for SpaceMobile Service in our agreements with MNOs.

The SpaceMobile Service is expected to be highly attractive to MNOs as it will enable them to improve and differentiate their service offering without significant incremental capital investments. The SpaceMobile Service is expected to enable MNOs to augment and extend their coverage without building towers or other land-based infrastructure, including where it is not cost-justified or is difficult due to geographical challenges. As a result of the incremental coverage created by the planned SpaceMobile Service, we believe that MNOs will have the opportunity to increase subscribers’ average revenue per user (“ARPU”).

On April 1, 2019, we launched our first test satellite, BW1, which was used to validate our satellite to cellular architecture and was capable of managing communications delays from LEO and the effects of doppler in a satellite to ground cellular environment using the 4G-LTE protocol.

We launched our BlueWalker 3 (“BW3”) test satellite on September 10, 2022, and announced the completion of the deployment of the communication phased array antenna of the BW3 test satellite in orbit on November 14, 2022. On April 25, 2023, we announced that we had successfully completed two-way voice calls directly to standard unmodified smartphones using the BW3 test satellite. On June 21, 2023, we announced that we had achieved repeated successful 4G download speeds of above 10 megabits per second (“Mbps”) to standard unmodified smartphones using the BW3 test satellite. On September 19, 2023, we announced that we had achieved repeated successful two-way voice calls directly to standard unmodified smartphones using 5G connectivity and successful download speeds of approximately 14 Mbps utilizing 5 megahertz (“Mhz”) of low band spectrum via the BW3 test satellite. We intend to continue testing capabilities of the BW3 test satellite, including further testing with cellular service providers and devices.

41

We are currently in the advanced stages of assembling and testing our first generation of commercial BB satellites (“Block 1 BB satellites”). We are leveraging skills, know-how and technological expertise derived from the design and assembly of our BW3 test satellite in the development and assembly of our BB satellite platform. The Block 1 BB satellites will be of similar size and weight to the BW3 test satellite, includes our own designed array solar panels and battery systems, and will have ten times higher throughput than the BW3 test satellite. The completion of five Block 1 BB satellites has been delayed as compared to our target completion timeline due to a delay in the commencement of integration and testing of five Block 1 BB satellites. The failure by suppliers of two key subsystems to meet their contractual delivery timelines contributed to this delay. To mitigate such risks in the future and reduce our dependency on these suppliers, we have reached an agreement with the supplier of one of the subsystems and obtained a non-exclusive and worldwide license of the design and manufacturing rights of this subsystem for use in our Block 2 BB satellites. We have also replaced the supplier of the other subsystem with a new supplier with whom we have completed a new design and own the IP of this subsystem. The new supplier will manufacture and supply this subsystem for use in our Block 2 BB satellites at a cost that is expected to be materially lower than the current cost of this subsystem. We expect these subsystems to not delay the timely completion of future BB satellites.

We currently estimate we will transport the five Block 1 BB satellites from our assembly facilities to the launch site between July and August of 2024 to await a launch window. This launch window will be disclosed once a window can be agreed upon. The exact timing of the new launch schedule will be contingent on a number of factors, including satisfactory and timely completion of assembly, integrating and testing of the satellites, regulatory approvals, launch provider availability, logistics, weather conditions, and other factors, many of which are beyond our control. We have a contractual right under the launch services agreement to reschedule the date of our dedicated launch, subject to the launch vehicle provider’s launch schedule availability and payment of a change fee.

The SpaceMobile Service has not been launched and therefore has not yet generated any revenue. Following the launch and deployment of five Block 1 BB satellites, we currently plan to initiate a limited, noncontinuous SpaceMobile Service in targeted geographical areas, including in the United States, and seek to generate revenue from such service. We are expanding our efforts on ground infrastructure development for commercial readiness and integrating our SpaceMobile service into the MNOs’ infrastructure to enable us to initiate commercial services. Prior to initiating such service, we will need to obtain regulatory approvals in each jurisdiction where we would provide such service and would need to enter into definitive agreements with MNOs relating to the offering of such service in each jurisdiction. We expect to enter into commercial agreements with MNOs for the use of our five Block 1 BB satellites, although there can be no assurance that we will be successful in entering into these agreements on terms acceptable to us or at all. In 2024, we expect to begin generating revenue from the resale of gateway equipment and associated services to MNOs and other third parties, and from completing defined milestones under an agreement with a prime contractor for the U.S. government. We believe initiation of limited, noncontinuous SpaceMobile Service as well as completing the milestones under the agreement with a prime contractor for the U.S. government will help to demonstrate the advantages of our satellite-based Cellular Broadband service in the market. These market activities will commence while we continue the development and testing of the next generation of BB satellites.

Our next generation of commercial BB satellites (“Block 2 BB satellites”) are expected to derive greater performance through the introduction of our own AST5000 Application Specific Integrated Circuit (“ASIC”) chip, which we believe will enable materially greater throughput capacity of up to 40 MHz per beam to support 120 Mbps peak data rates and up to 10,000 MHz of processing bandwidth per Block 2 BB satellite, require less power and offer a lower overall unit cost. We have completed the design and have commenced the tape-out of our ASIC chip in March 2024. The Block 2 BB satellites are expected to be approximately 2,400 square feet in size, almost 3.5 times bigger than the Block 1 BB satellites, and will have the largest phased array ever deployed in a LEO for commercial use exceeding the phased array of the BW3 test satellite and planned Block 1 BB satellites. We believe the larger aperture array is expected to provide greater spectrum reuse, enhanced signal strength and increased capacity, thereby reducing the necessary number of satellites to achieve service coverage as compared to smaller apertures.

We continue to make progress towards the completion of the design and development of our Block 2 BB satellites. We believe we will benefit from the skills, technological expertise, and manufacturing know-how derived from the assembly and testing of our Block 1 BB satellite in the development and assembly of our Block 2 BB satellites. We began the design and development of the Block 2 BB satellites prior to the design and development of Block 1 BB satellites. We have commenced planning and procurement activities to begin the assembly, integration and testing of the Block 2 BB satellites and have entered into agreements and placed orders for procurement of materials required for manufacturing the satellite components, and subsystems required for the assembly of Block 2 BB satellites. We plan to continue to manufacture the satellite components and subsystems for Block 2 BB satellites as soon as the assembly and testing of Block 1 BB satellites are complete. The first Block 2 BB satellite will be based on a FPGA chip and future Block 2 BB satellites will use the ASIC chip. We have entered into an agreement with a launch service provider to launch the first Block 2 BB satellite. The agreement has a launch window of December 15, 2024 to March 31, 2025. The exact timing of this launch is contingent on a number of factors, including satisfactory and timely completion of the design, assembly and testing of the Block 2 BB satellite, regulatory approvals, availability of launch windows by the launch providers,

42

logistics, and other factors, many of which are beyond our control. We have a contractual right under the launch services agreement to reschedule the date of our dedicated launch, subject to the launch vehicle provider’s launch schedule availability.

We are developing a phased satellite deployment plan and corresponding commercial launch plan of the SpaceMobile Service based on targeted geographical areas to provide the SpaceMobile Service to the most commercially attractive MNO markets. This prioritization of coverage is designed to minimize the capital required to initiate and operate commercial service that generates cash flows from operating activities sooner. We expect that such a successful commercial service would enable us to attract additional capital to continue to assemble and launch additional BB satellites to expand our capacity and geographic coverage area, although there can be no assurance that such capital would be available on terms acceptable to us, or at all.

We plan to achieve substantial service in the selected, targeted geographical areas with the launch and operation of 25 BB satellites and achieve substantial service in all targeted geographical areas to meet our long term business goals with the launch and operation of approximately 95 BB satellites. We anticipate launching and deploying additional satellites beyond the initial 95 satellites in order to enhance coverage and system capacity in response to incremental market demand. Our current plan is subject to numerous uncertainties, many of which are beyond our control, including satisfactory and timely completion of assembly and testing of the satellites, availability of launch windows by the launch providers, our ability to raise capital, proposed orbits and resulting satellite coverage, launch costs, ability to enter into agreements with MNOs, regulatory approvals, and other factors. We may adopt a strategy for commercial launch of the SpaceMobile Service, including the nature and type of services offered and the geographic areas where we may launch such services, that may differ materially from our current plan.

We are an early stage and emerging growth company and, as such, we are subject to all of the risks associated with early stage and emerging growth companies. Please refer to Risk Factors contained in Part I, “Item 1A. Risk Factors” included in our Annual Report.

Recent Developments

Convertible Security Investment Agreement

On January 16, 2024, we entered into a Convertible Security Investment Agreement (the “Investment Agreement”) with AT&T, Google and Vodafone (the “Investors”) to issue subordinated convertible notes for an aggregate principal amount of $110.0 million (such notes, the “Notes” and such investments, the “Investments”) to the Investors. The Notes bear interest at a rate of 5.50% per year, payable semi-annually in arrears beginning on June 30, 2024, in cash or in kind at our option. The Notes have a ten-year term unless earlier converted.

The holders of the Notes (the “Holders”) may at their option convert the Notes (subject to certain exceptions) at any time on or after January 16, 2025 at an initial conversion rate of 173.9130 shares of Class A Common Stock per $1,000 principal amount of Notes (equivalent to an initial conversion price of $5.75 per share of Class A Common Stock). On or after January 16, 2025, we also have an option to require the Holders to convert the Notes (subject to certain exceptions) at the same initial conversion rate of 173.9130 shares of Class A Common Stock per $1,000 principal amount of Notes if the VWAP of the Class A Common Stock has been at least 130% of the conversion price then in effect for 30 consecutive trading days, on the immediately succeeding trading day after the last trading day of such 30 day period. The Notes may be accelerated upon the occurrence of certain events of default and fundamental change. Refer to Note 17: Subsequent events in the accompanying notes to the consolidated financial statements for further information.

Letter Agreements

On January 16, 2024, in connection with the Investments, each of AT&T Services, Inc. (“AT&T Services”), Google and Vodafone Group Services have entered into letter agreements with us (the “Letter Agreements”).

The letter agreement between AT&T Services and us provides, among other things, that AT&T Services will make a non-refundable $20.0 million commercial payment for prepaid service revenue, creditable against our future service revenue, due after the launch and successful initial operation of the first five commercial satellites. AT&T Services also submitted a purchase order under a separate agreement for purchase of network equipment from us to support planned commercial service. Under the letter agreement, we are required to use reasonable best efforts to cause our Stockholders’ Agreement, dated April 6, 2021 to be amended such that AT&T Services shall have the right to nominate, and the parties to such Stockholders’ Agreement agree to vote for and cause the appointment of, any representative of AT&T Services that it determines in its sole discretion to (i) serve as a non-voting observer to our board of directors or (ii) serve as a director to our board of directors.

43

We entered into a letter agreement with Google whereby the parties will negotiate and execute a definitive agreement to provide, among other things, certain services to each other and have agreed to collaborate on product development, testing and implementation plans for SpaceMobile network connectivity on Android devices.

The letter agreement between Vodafone Group Services and us provides, among other things, for an initial revenue commitment of $25.0 million to us to be paid by Vodafone Group Services over a two and a half year period to be defined in a future definitive agreement for us to provide connectivity services. Vodafone also submitted a purchase order for purchase of network equipment from us to support planned commercial service.

January 2024 Common Stock Offering

On January 23, 2024, we issued 32,258,064 shares of Class A Common Stock in a public offering and received proceeds of $93.6 million, net of underwriting commissions of $6.0 million and transaction costs of $0.4 million. We provided a 30-day option to the underwriting agent to purchase up to an additional 4,838,709 shares of Class A Common Stock (the “Option Shares”) from us on the same terms and conditions. On January 25, 2024, the Option Shares were exercised in full. The offering of the Option Shares closed on January 29, 2024 for proceeds of $14.1 million, net of underwriting commissions of $0.9 million. Proceeds from the sale of our Class A common stock under the January 2024 Common Stock Offering were and are expected to be used for general corporate purposes.

Impact of Global Macroeconomic and Geopolitical Conflicts

We continue to closely monitor the impact of macroeconomic conditions, including heightened inflation, changes to fiscal and monetary policies, higher interest rates, volatility in the capital markets, supply chain challenges, and geopolitical conflicts on all aspects of our business across geographies, including how it has and may continue to impact our operations, workforce, suppliers, and our ability to raise additional capital to fund operating and capital expenditures.

Changes in the prices of satellite materials due to inflation, supply chain challenges, and other macroeconomic factors may affect our capital costs estimates to build and launch the satellite constellation and adversely affect our financial condition. The extent of impact of these factors on our business will depend on future developments that are highly uncertain and cannot be predicted with confidence at this time. To date, these factors have not had a material impact to our technology development efforts or results of our operations. However, if macroeconomic conditions deteriorate or there are unforeseen developments, our results of operations and financial condition may be adversely affected.

We operate from multiple locations that include our corporate headquarters and 185,000 square feet AIT facilities in Texas where the final AIT is performed, and engineering and development centers elsewhere in the United States, India, Scotland, Spain and Israel. Our operations in Israel constitute approximately 5% of the consolidated total assets and approximately 12% of consolidated total operating expenses of the Company. To date, our operations in Israel have not been materially impacted by the geopolitical conflict in the Middle East. We currently do not expect potential interruptions to our operations in Israel to have a material impact on the Company.

Factors Affecting Comparability of Our Future Results of Operations to Our Historical Results of Operations

Our historical financial performance has been, and we expect our financial performance in the future to be driven by our ability to execute on our strategy. Our future results of operations could differ materially from the historical results of operations as we expect to complete the assembly and launch the five Block 1 BB satellites, initiate the limited, noncontinuous SpaceMobile Service in certain targeted geographical areas, fulfill our obligations under the contracts for gateway stations and under an agreement with a prime contractor of a U.S. government contract, complete the tape-out of our ASIC chip, set up ground cellular and infrastructure for commercial readiness, complete the design of the Block 2 BB satellites, commence the assembly, integration and testing of the Block 2 BB satellites, and launch the first Block 2 BB satellite.

Components of Results of Operations

Revenues

To date, we have not generated any revenues from our SpaceMobile Service. All revenues during the year ended December 31, 2022 were generated from sales and services by our former subsidiary, Nano. Following the completion of the sale of Nano on September 6, 2022, we did not generate any revenue. Following the launch and deployment of five Block 1 BB satellites, we currently plan to initiate a limited, noncontinuous SpaceMobile Service in targeted geographical areas, including in the United States, subject to obtaining regulatory approval and negotiating and executing definitive agreements with MNOs, and seek to

44

generate revenue from such service. In 2024, we expect to begin generating revenue from the resale of gateway equipment and associated services to MNOs and other third parties, and from completing defined milestones under an agreement with a prime contractor for a U.S. government contract.

Cost of Sales

Cost of sales during the year ended December 31, 2022 consisted of the costs incurred to fulfill Nano’s sales contracts. Following the completion of the sale of Nano on September 6, 2022, we did not incur any costs of sales. We do not expect to generate revenue and incur associated cost of sales in future periods until we launch the SpaceMobile Service and/or begin to generate revenue from the resale of gateway equipment and associated services to MNOs and third parties, and meet future milestones under the agreement with a prime contractor for a U.S. government contract.

Engineering Services Costs

Engineering services costs are charged to expense as incurred. Engineering services costs consist primarily of the cost of employees and consultants involved in the design and development of the BB satellites, managing the network and satellite operations centers, and indirect costs related to the assembly, integration and testing of the BB satellites, license cost, and general expenses related to AIT facilities and engineering development centers.

General and Administrative Costs

General and administrative costs include the costs of insurance, cost of non-engineering personnel and personnel related expenses, software licensing and subscriptions, office and facilities expenses, investor relations, and professional services, including public relations, accounting and legal fees.

Research and Development Costs

R&D costs are charged to expense as incurred. R&D costs consist principally of development activities in which we typically engage third-party vendors and are largely driven by the achievement of milestones that trigger payments and costs of materials in supplies consumed in the development activities. R&D costs are expected to fluctuate quarter over quarter depending on achievement of milestones.

Depreciation and Amortization

Depreciation and amortization expense includes depreciation expense related to property and equipment including the BW3 test satellite, as well as definite lived intangible assets. We began depreciating the BW3 test satellite as of April 25, 2023 over its expected remaining useful life of approximately 16 months.

Gain (Loss) on Remeasurement of Warrant Liabilities

Public Warrants and Private Placement Warrants issued by us are accounted for as liability-classified instruments at their initial fair value on the date of issuance. They are remeasured on each balance sheet date and changes in the estimated fair value are recognized as an unrealized gain or loss in the consolidated statements of operations.

Interest Income (Expense), net

Interest income (expense), net consists of interest earned on cash and cash equivalents held in interest bearing demand deposit accounts, net of any interest expense and amortization of debt issuance costs associated with our debt arrangements.

Other Income (Expense), Net

Other income (expense), net primarily consists of non-operating expense and income, including foreign exchange gains or losses.

Income Tax Expense

AST LLC is treated as a partnership for U.S. federal and state income tax purposes. Also, we had a controlling ownership interest in our former subsidiary, Nano, a Lithuanian company, through September 6, 2022, that is subject to foreign income taxes and is also treated as a partnership for U.S. federal and state and local taxes. Accordingly, all income, losses, and other tax attributes pass through to the members’ income tax returns, and no U.S. federal and state and local provision for income taxes has been

45

recorded for AST LLC in the consolidated financial statements. Certain foreign wholly-owned entities are taxed as corporations in the jurisdictions in which they operate, and accruals for such taxes are included in the consolidated financial statements.

Noncontrolling Interest

Noncontrolling interest primarily represents the equity interest in AST LLC held by members other than us. As of December 31, 2023, noncontrolling interest in AST LLC was approximately 58.7%. For the year ended December 31, 2022, noncontrolling interest also included approximately 49.0% equity interests in our former subsidiary, Nano, held by equityholders other than us. On September 6, 2022, the noncontrolling interest was eliminated in connection with the sale of the Company’s 51% interest in Nano. We attributed a portion of net income or loss generated at AST LLC and Nano to the noncontrolling interest based on their ownership interests.

Results of Operations

We report our results of operations under one operating segment. The following table sets forth a summary of our consolidated statements of operations for the years ended December 31, 2023 and 2022 (in thousands) and the discussion that follows compares the year ended December 31, 2023, to the year ended December 31, 2022.

Year ended December 31,
20232022$ Change% Change
Revenues$-$13,825$(13,825)(100)%
Cost of sales (exclusive of items shown separately below)-6,714(6,714)(100)
Gross profit-7,111(7,111)(100)
Operating expenses:
Engineering services78,81154,21224,59945
General and administrative costs41,60148,332(6,731)(14)
Research and development costs47,48645,6201,8664
Depreciation and amortization54,4694,71149,7581,056
Total operating expenses222,367152,87569,49245
Other income (expense):
Gain on remeasurement of warrant liabilities8,98619,114(10,128)(53)
Interest income (expense), net2,6752,633422
Other (expense) income, net(10,290)21,521(31,811)(148)
Total other income (expense), net1,37143,268(41,897)(97)
Loss before income tax expense(220,996)(102,496)(118,500)116
Income tax expense(1,681)(617)(1,064)172
Net loss before allocation to noncontrolling interest(222,677)(103,113)(119,564)116
Net loss attributable to noncontrolling interest(135,116)(71,473)(63,643)89
Net loss attributable to common stockholders$(87,561)$(31,640)$(55,921)177%

Revenues

All revenues during the year ended December 31, 2022 were generated from sales and services provided by our former subsidiary, Nano. Following the completion of the sale of Nano on September 6, 2022, we no longer generated revenue.

Cost of Sales

Cost of sales during the year ended December 31, 2022 consisted of the costs incurred to fulfill Nano’s sales contracts. Following the completion of the sale of Nano on September 6, 2022, we no longer generated revenue and incurred associated cost of sales.

46

Engineering Services Costs

Total engineering services costs increased by $24.6 million, or 45%, to $78.8 million for the year ended December 31, 2023 as compared to the year ended December 31, 2022. The increase was primarily attributable to a $10.5 million increase in payroll and employee related costs, including stock-based compensation expense, due to an increase in headcount and milestones bonuses paid upon achievement of certain milestones, an increase of $10.2 million in AIT facilities and activities and engineering development centers costs including managing mission operations and ground infrastructure and travel expenses, and an increase of $3.9 million in indirect costs associated with testing and production activities.

General and Administrative Costs

Total general and administrative costs decreased by $6.7 million, or 14%, to $41.6 million for the year ended December 31, 2023 as compared to the year ended December 31, 2022. The decrease was driven by elimination of $5.7 million of costs related to Nano as Nano is no longer consolidated following its sale in September 2022, and a net decrease of $1.0 million in travel expenses and other miscellaneous expenses.

Research and Development Costs

Total R&D costs increased by $1.9 million, or 4%, to $47.5 million for the year ended December 31, 2023 as compared to the year ended December 31, 2022. R&D costs during the year ended December 31, 2023 were incurred primarily for completing the design and development of BB Block 1 satellites, progressing the design and development of certain subsystems for the BB Block 2 satellites, completing the IP design of our ASIC chip, and continued development of ground infrastructure programs for commercial readiness. R&D costs during the year ended December 31, 2022 were incurred primarily for the design and development of the BB Block 2 satellites and developing our ASIC chip. The increase in R&D costs was primarily driven by increases for the design and development of the BB Block 1 satellites and the development of ground infrastructure programs for commercial readiness, which were offset by completing the IP design of our ASIC chip and reduced expenditure on the design and development of certain subsystems for the BB Block 2 satellites during the current period.

Depreciation and Amortization

Total depreciation and amortization expense increased by $49.8 million, or 1,056%, to $54.5 million for the year ended December 31, 2023 as compared to the year ended December 31, 2022. The increase was primarily due to commencing depreciation of the BW3 test satellite from April 25, 2023, the date on which we determined that BW3 had met its intended use.

Gain on Remeasurement of Warrant Liabilities

Decrease in fair value of warrant liabilities resulted in a gain of $9.0 million for the year ended December 31, 2023 as compared to the gain of $19.1 million during the year ended December 31, 2022.

Interest Income (Expense), net

Total interest income (expense), net increased by less than $0.1 million, or 2%, to $2.7 million for the year ended December 31, 2023 as compared to the year ended December 31, 2022. The increase was driven by an increase of $4.3 million in interest income earned on cash and cash equivalents held in interest bearing demand deposit accounts, partially offset by an increase of $4.2 million in interest expense and amortization of debt issuance costs incurred in connection with our debt arrangements.

Other (Expense) Income, net

Total other (expense) income, net was $(10.3) million for the year ended December 31, 2023 as compared to $21.5 million in the year ended December 31, 2022. The decrease of $31.8 million was primarily due to the net gain of $24.6 million recognized in connection with the sale of Nano in 2022, a payment of $10.0 million in the third quarter of 2023 to a related party in accordance with the contractual agreement, partially offset by $1.4 million of transaction costs incurred in connection with the Equity Line of Credit (as defined herein) in 2022 and a decrease of $1.4 million in other non-operating income and foreign exchange loss.

47

Income Tax Expense

The provision for income taxes was $1.7 million and $0.6 million for the years ended December 31, 2023 and 2022, respectively. The consolidated effective tax rate for years ended December 31, 2023 and 2022 was (1%). Refer to Note 14: Income Taxes in the accompanying notes to the consolidated financial statements for further information.

Net Loss Attributable to Noncontrolling Interest

Net loss attributable to noncontrolling interest was $135.1 million for the year ended December 31, 2023 as compared to $71.5 million in the year ended December 31, 2022. This increase in net loss correlates with the increase in net loss generated at AST LLC given the noncontrolling interest represents a portion of such net loss.

Liquidity and Capital Resources

Our current sources of liquidity are cash and cash equivalents on hand and access to equity programs currently in place, which consist of an Equity Line of Credit (as defined herein) and the ATM Program (as defined herein). As of December 31, 2023, we had $88.1 million of cash and cash equivalents on hand, including $2.5 million of restricted cash. In January 2024, we raised net proceeds of $107.7 million from the issuance of Class A Common Stock through our Common Stock Offering and $110.0 million from the issuance of convertible notes under the Convertible Security Investment Agreement. We believe our cash and cash equivalents on hand, which is estimated at $210.8 million as of March 31, 2024, and our ability to raise capital through access to the Equity Line of Credit and the ATM Equity Program, will be sufficient to meet our current working capital needs, planned operating expenses and capital expenditures for a period of the next 12 months from the date of this Annual Report on Form 10-K.

The design, assembly, integration, testing and launch of satellites and related ground infrastructure is capital intensive. We currently estimate the capital expenditure, primarily direct materials and launch costs, required for the assembly, integration, testing and launch of the five Block 1 BB satellites to be approximately $115.0 million, and we have paid over 90% of this expenditure as of the date of this Annual Report on Form 10-K. We currently believe that the estimated average capital costs, consisting primarily of direct materials and launch costs, required for the assembly, integration, testing and launch of a constellation of 95 Block 2 BB satellites to be approximately $16.0 million to $18.0 million per satellite. The estimated capital cost per Block 2 BB satellite is based on a number of factors, including securing launch contracts with more favorable terms, bulk ordering of parts and components, cost reductions due to the benefits of economies of scale and process improvements, and other factors. If we are unable to achieve these cost reductions, process improvements, and favorable launch contracts, the average capital cost of the Block 2 BB satellites will be higher and such variations could be material.

We believe we need to launch and operate 25 BB satellites (five Block 1 BB satellites and 20 Block 2 BB satellites) in order to provide coverage to the most commercially attractive MNO markets. In addition to the cash and cash equivalents we had on hand as of March 28, 2024, we currently estimate we will need to raise approximately $350.0 million to $400.0 million to fund operating expenses and capital expenditures necessary to design, assemble and launch 20 Block 2 BB satellites and operate a constellation of 25 BB satellites.

We evaluate our market, product and coverage plans based upon the attractiveness of certain markets, our technology, regulatory concerns and our access to capital and other resources. We believe we can develop satellite configurations which target delivering service to certain attractive markets without the necessity of building a constellation which covers the entire globe. This modularity of our satellite configuration enables us to alter the timing and size of our satellite roll out and provides us flexibility to dynamically change our market plans and capital requirements. As a result, we believe we have the ability to accelerate or slow down our business plan depending upon the availability of capital to support our strategies.

We plan to raise additional capital through the issuance of equity, equity-linked or debt securities (secured or unsecured), secured or unsecured loans or other debt facilities, and credit from government or financial institutions or commercial partners, including through our existing Equity Line of Credit and the ATM Equity Program. We also intend to seek to draw the remaining available credit under the Senior Secured Credit Facility. Our ability to access the capital markets during this period of volatility may require us to modify our current expectations. There can be no assurance that additional funds will be available to us on favorable terms or at all. If we cannot raise additional funds when needed in the future, our financial condition, results of operations, business and prospects may be materially and adversely affected.

48

Commitments

The following table summarizes the contractual minimum principal and interest payments required on all of our outstanding debt and operating leases by period due date, as of December 31, 2023 (in thousands):

Payments Due by Period
Contractual Obligations20242025202620272028ThereafterTotal
Debt$252$2,920$55,125$2,466$5,363$5,655$71,781
Operating leases3,0782,9092,5412,3262,2698,86721,990
Contractual interest on debt8,9228,7605,6979587664525,148
Total contractual obligations$12,252$14,589$63,363$5,750$8,398$14,567$118,919

Also, as of December 31, 2023, we had contractual commitments with third parties in the aggregate amount of $13.5 million related to procurement of BB satellite components, certain R&D programs, and capital improvements. We expect these commitments will continue to increase as we make progress to assemble, integrate and test Block 2 BB satellites, and enter into launch agreements for the launch of Block 2 BB satellites.

Common Stock Purchase Agreement

On May 6, 2022, we entered into the Common Stock Purchase Agreement (the “Common Stock Purchase Agreement” or “Equity Line of Credit”) with B. Riley Principal Capital, LLC (“B. Riley”) to sell, at our sole discretion, to B. Riley up to $75.0 million of shares of our Class A Common Stock at 97% of the volume weighted average price (“VWAP”) of the Class A Common Stock calculated in accordance with the Common Stock Purchase Agreement, over a period of 24 months subject to certain limitations and conditions contained in the Common Stock Purchase Agreement. Sales and timing of any sales of Class A Common Stock are solely at our election, and we are under no obligation to sell any securities to B. Riley under the Common Stock Purchase Agreement. We plan to raise capital, as and when needed, under the Common Stock Purchase Agreement at our sole discretion. Proceeds from the sale of our Class A Common Stock under the Common Stock Purchase Agreement were and will continue to be used for general corporate purposes.

Equity Distribution Agreement

On September 8, 2022, we entered into an Equity Distribution Agreement (the “Sales Agreement” or “ATM Equity Program”) with Evercore Group L.L.C. and B. Riley Securities, Inc. (collectively, the “agents”) to sell shares of our Class A Common Stock having an aggregate sales price of up to $150.0 million through an “at the market offering” program under which the agents will act as sales agents. The agents are entitled to total compensation at a commission rate of up to 3.0% of the gross sales price per share sold. We plan to raise capital, as and when needed, under the Sales Agreement at our sole discretion. Proceeds from the sale of our Class A Common Stock under the Sales Agreement were and will continue to be used for general corporate purposes.

Term loan

In December 2021, concurrent with the purchase of real property and equipment in Midland, Texas, our wholly-owned subsidiary, AST & Science Texas, LLC (“AST Texas”), entered into a credit agreement with Lone Star State Bank of West Texas (the “Term Loan Credit Agreement”) providing for a $5.0 million term loan secured by the property. Borrowings under the term loan bear interest at a fixed rate equal to 4.20% per annum until December 7, 2026, and from December 8, 2026 until December 8, 2028 at a fixed rate per annum equal to 4.20% plus adjustment if the index rate as defined in the Term Loan Credit Agreement is greater than 4.20%, subject to a maximum interest rate of 4.90% per annum. Refer to Note 8: Debt in the accompanying notes to the consolidated financial statements for further information.

The Term Loan Credit Agreement contains certain customary events of default, and certain covenants that limit AST Texas’ ability to, among other things, create liens on collateral, consolidate, merge, sell, or otherwise dispose of all or substantially all of their assets; and enter into certain transactions with their affiliates. If AST Texas fails to perform its obligations under these and other covenants, or should any event of default occur, the term loan may be terminated and any outstanding borrowings, together with unpaid accrued interest, could be declared immediately due and payable, and the lender will be authorized to take possession of the collateral.

49

Senior secured credit facility

On August 14, 2023, we entered into a senior secured term loan credit agreement with ACP Post Oak Credit II LLC as administrative agent and collateral agent and Atlas Credit Partners, LLC (“Atlas”) as lender, providing for a principal loan commitment of up to $100.0 million (the “Atlas Credit Agreement”), of which $48.5 million was borrowed upon closing. In addition, a two-year collateral protection insurance policy was issued to the lenders and a cash premium based on a single digit percentage of the amount drawn was paid to the insurance provider thereunder (the “Cash Premium”). An additional amount of $51.5 million may be borrowed only to the extent we raise additional capital through equity raises and receive additional insurance coverage such that we have insurance coverage equal to at least the amount of borrowings under the credit facility.

The initial borrowings of $48.5 million accrue interest at a fixed rate equal to three-month secured overnight financing rate (“SOFR”) as of the closing date plus 9.625% per annum equal to 14.75% (the “Atlas Fixed Rate”), payable on the last business day of each fiscal quarter. The borrowing amounts are payable at maturity on August 14, 2026 and are subject to mandatory prepayments upon the occurrence of certain specified events.

Borrowings are secured by substantially all of our assets other than the assets of certain excluded subsidiaries. The Atlas Credit Agreement contains customary affirmative and negative covenants, requires us to maintain certain levels of liquidity, limits our ability to incur additional indebtedness, make restricted payments (including cash dividends on common stock), and sell or otherwise dispose of our assets, among other restrictions.

Upon closing, we received net proceeds of $37.2 million, net of debt issuance costs of $9.5 million and deposit of $1.8 million into an interest reserve escrow account. Debt issuance costs of $9.5 million consist of agent fees, offering expenses, and two years of cash premium coverage. The net proceeds were and are expected to continue to be used for general corporate purposes as permitted under the Atlas Credit Agreement.

Capital equipment loan

On August 14, 2023, we entered into a loan agreement with Lone Star State Bank of West Texas (“Lone Star”) as lender, providing for $15.0 million principal term loan commitment secured by certain real property fixtures and equipment in one of our Texas facilities (the “Lone Star Loan Agreement”).

Borrowings accrue interest at the Prime Rate plus 0.75%, subject to a ceiling rate. Interest payments are due and payable on a monthly basis. Interest payments began in September 2023 and principal payments will begin in April 2025. Principal repayments are thereafter due in 48 equal monthly installments until January 2029, the maturity date of the loan. In connection with the Lone Star Loan Agreement, we deposited a cash balance of $15.0 million in the Lone Star Bank Money Market Fund. This cash balance will be converted to restricted cash if we fail to maintain a consolidated balance of cash and cash equivalents of at least $75.0 million. This restricted cash will be used to offset against the term loan obligations if we fail to maintain a consolidated balance of cash and cash equivalents of at least $50.0 million. In addition, the Lone Star Loan Agreement includes certain customary affirmative and negative covenants.

We drew the entire $15.0 million facility on September 19, 2023 and incurred $0.1 million of transaction costs. The net proceeds were and are expected to continue to be used for general corporate purposes.

Convertible Security Investment Agreement

On January 16, 2024, we entered into a Convertible Security Investment Agreement (the “Investment Agreement”) with AT&T Venture Investments, LLC (“AT&T”), Google LLC (“Google”) and Vodafone Ventures Limited (“Vodafone”, and together, the “Investors”) to issue subordinated convertible notes for an aggregate principal amount of $110.0 million (such notes, the “Notes” and such investments, the “Investments”) to the Investors. The Notes bear interest at a rate of 5.50% per year, payable semi-annually in arrears beginning on June 30, 2024, in cash or in kind at our option. We intend to elect to pay the contractual interest amount in kind. The Notes have a ten-year term unless earlier converted. The net proceeds are expected to be used for general corporate purposes.

The holders of the Notes (the “Holders”) may at their option convert the Notes (subject to certain exceptions) at any time on or after January 16, 2025 at an initial conversion rate of 173.9130 shares of Class A Common Stock per $1,000 principal amount of Notes (equivalent to an initial conversion price of $5.75 per share of Class A Common Stock). On or after January 16, 2025, we also have an option to require the Holders to convert the Notes (subject to certain exceptions) at the same initial conversion rate of 173.9130 shares of Class A Common Stock per $1,000 principal amount of Notes if the VWAP of the Class A Common Stock has been at least 130% of the conversion price then in effect for 30 consecutive trading days, on the immediately succeeding

50

trading day after the last trading day of such 30 day period. The Notes may be accelerated upon the occurrence of certain events of default and fundamental change.

January 2024 Common Stock Offering

On January 23, 2024, we issued 32,258,064 shares of Class A Common Stock in a public offering and received proceeds of $93.6 million, net of underwriting commissions of $6.0 million and transaction costs of $0.4 million. We provided a 30-day option to the underwriting agent to purchase up to an additional 4,838,709 shares of Class A Common Stock (the “Option Shares”) from us on the same terms and conditions. On January 25, 2024, the Option Shares were exercised in full. The offering of the Option Shares closed on January 29, 2024 for proceeds of $14.1 million, net of underwriting commissions of $0.9 million. Proceeds from the sale of our Class A common stock under the January 2024 Common Stock Offering were and are expected to be used for general corporate purposes.

Cash Flows

Historical Cash Flows

The following table summarizes our sources and uses of cash for the years ended December 31, 2023 and 2022 (in thousands):

Year ended December 31,
20232022
Cash, cash equivalents and restricted cash$88,097$239,256
Cash used in operating activities$(148,942)$(156,464)
Cash used in investing activities(118,807)(31,352)
Cash provided by financing activities116,732102,340

Operating activities

Cash used in operating activities was $148.9 million for the year ended December 31, 2023, as compared to cash used in operating activities of $156.5 million for the year ended December 31, 2022. The $7.5 million decrease in cash used in operating activities was attributable to a decrease of $38.1 million in working capital offset by an increase of $30.6 million in expenses to support expanded operations during the year ended December 31, 2023.

Investing activities

Cash used in investing activities was $118.8 million for the year ended December 31, 2023, as compared to cash used in investing activities of $31.4 million for the year ended December 31, 2022. The $87.5 million increase in cash used in investing activities was primarily attributable to a $61.5 million increase in purchases of property and equipment, including procurement of BB satellite materials and advance launch payments, and $26.0 million proceeds from sale of Nano, net of cash deconsolidated and transaction costs, in September 2022.

Financing activities

Cash provided by financing activities was $116.7 million for the year ended December 31, 2023, as compared to cash provided by financing activities of $102.3 million for the year ended December 31, 2022. The $14.4 million increase in cash provided by financing activities was primarily attributable to $53.4 million of net proceeds from borrowings on the Atlas Credit Agreement and Lone Star Loan Agreement, partially offset by $39.0 million decrease in net proceeds from the sale of Class A Common Stock under the secondary public offerings, ATM Equity Program and Equity Line of Credit.

Impact of inflation

While inflation may impact our capital and operating expenditures, we believe the effects of inflation, if any, on our results of operations and financial condition have not been significant. However, there can be no assurance that our results of operations and financial condition will not be materially impacted by inflation in the future, including by heightened levels of inflation experienced globally as a consequence of the rapidly changing market and economic conditions.

51

Funding Requirements

We believe our existing cash and cash equivalents as of December 31, 2023, funds raised in January 2024 and access to the Equity Line of Credit and ATM Equity Program will be sufficient to meet anticipated cash requirements for the next 12 months from the date hereof. However, our forecast of the period of time through which our financial resources will be adequate to support operations is a forward-looking statement that involves risks and uncertainties, and actual results could vary materially. We have based this estimate on assumptions that may prove to be wrong, and we could expend capital resources sooner than we expect.

Future capital requirements will depend on many factors, including:


Establishing and maintaining supply and manufacturing relationships with third parties that can provide adequate, in both amount and quality, products and services to support our satellite development;


Technological or manufacturing and assembling difficulties, design issues or other unforeseen matters;


Negotiation of launch agreements (including launch costs), launch delays or failures, deployment failures, or in-orbit satellite failures;


Seeking and obtaining necessary regulatory approvals;


Timing of the launch of our satellites and subsequent initiation of service in various markets, delays in which will result in increased operating expenses;


Addressing any competing technological and market developments;


Ability to adjust our expenditures and contractual commitments based on capital availability;


Ability to operate under the covenants in our debt agreements; and


Attracting, hiring, and retaining qualified personnel.

Until such time, if ever, as we can generate substantial revenues to support our cost structure, we expect to finance cash needs through a combination of equity offerings, debt financings, commercial and other similar arrangements. To the extent that we raise additional capital through the sale of equity or convertible debt securities, the ownership interest of stockholders will be, or could be, diluted, and the terms of these securities may include liquidation or other preferences that adversely affect the rights of common stockholders. Debt financing and equity financing, if available, may involve agreements that include covenants limiting or restricting our ability to take specific actions, such as incurring additional debt, making capital expenditures or declaring dividends. If we raise funds through commercial agreements, or other similar arrangements with third parties, we may have to relinquish valuable rights to our technologies and/or future revenue streams, or grant licenses on terms that may not be favorable to us and/or may reduce the value of our common stock. Also, our ability to raise necessary financing could be impacted by recent geopolitical events, higher interest rates and inflationary economic conditions and their effects on the market conditions. If we are unable to raise additional funds through equity offerings, debt financings or commercial arrangements when needed, we may be required to delay, limit, reduce or terminate our commercialization efforts or grant rights to develop and market other services even if we would otherwise prefer to develop and market these services ourselves, or potentially discontinue operations.

Critical Accounting Policies

Our consolidated financial statements have been prepared in accordance with accounting principles generally accepted in the United States (U.S. GAAP). Preparation of the financial statements requires our management to make judgments, estimates and assumptions that impact the reported amount of revenue and expenses, assets and liabilities and the disclosure of contingent assets and liabilities. We consider an accounting judgment, estimate or assumption to be critical when (1) the estimate or assumption is complex in nature or requires a high degree of judgment and (2) the use of different judgments, estimates and assumptions could have a material impact on our consolidated financial statements. Our significant accounting policies are described in Note 2: Summary of Significant Accounting Policies of the consolidated financial statements included elsewhere in this Report. Our critical accounting policies are described below.

Property and Equipment

We design and self-construct the BB satellites intended to be used to provide SpaceMobile Service to customers. The BB satellites are not intended to be held for sale in the ordinary course of business. The costs incurred to complete the design is expensed as incurred. The cost incurred to complete the construction is capitalized as property and equipment. The cost of self-constructed BB satellite assets consists of direct materials, direct labor, launch costs and other direct costs attributable to bringing the asset to a working condition and desired location for the intended use. Costs incurred, including direct materials purchased and launch

52

payments made, until the completion of the construction and launch of the BB satellites, are reported as satellite materials, satellites under construction, and advance launch payments within construction-in-progress. Once launched in orbit, the costs of the BB satellites are reported as satellites in orbit and depreciation of the satellites commences once the BB satellites are ready for their intended use.

We capitalize the costs of the test satellites if there is an alternative future use for the test satellites. We capitalize only those expenditures and ancillary costs that are directly attributable to assembly and testing and necessarily incurred to place the test satellites into their intended location and use. These costs include materials costs, launch cost, and other non-recurring costs directly associated with the development of the test satellites. The other non-recurring costs primarily include third-party vendors who are hired solely for the design, assembly, and testing of the test satellite and are responsible for the value and progression of the project. The costs for internal, recurrent engineering employees and consultants are expensed as engineering services costs and not capitalized to the cost of the test satellites, as these employees are not directly associated with the development of the test satellites.

Warrant Liabilities

We account for warrants as either equity-classified or liability-classified instruments based on an assessment of the warrant’s specific terms and applicable authoritative guidance in ASC 480, Distinguishing Liabilities from Equity (“ASC 480”) and ASC 815, Derivatives and Hedging (“ASC 815”). Our assessment considers whether the warrants are freestanding financial instruments pursuant to ASC 480, whether they meet the definition of a liability pursuant to ASC 480, and whether the warrants meet all of the requirements for equity classification under ASC 815, including whether the warrants are indexed to our own common stock and whether the warrant holders could potentially require “net cash settlement” in a circumstance outside of our control, among other conditions for equity classification. This assessment, which requires the use of professional judgment, is conducted at the time of warrant issuance and as of each subsequent quarterly period-end date while the warrants are outstanding.

For issued or modified warrants that meet all of the criteria for equity classification, they are recorded as a component of additional paid-in capital at the time of issuance. Issued or modified warrants that do not meet all the criteria for equity classification are recorded at their initial fair value on the date of issuance and subject to remeasurement each balance sheet date with changes in the estimated fair value of the warrants to be recognized as an unrealized gain or loss in the consolidated statements of operations.

Impairment of Long-Lived Assets

We assess the impairment of long-lived assets whenever events or changes in circumstances indicate that the carrying value may not be recoverable. Factors we consider important in the determination of an impairment include significant underperformance relative to historical or projected future operating results, significant changes in the manner that we use the acquired asset and significant negative industry or economic trends.

Off-Balance Sheet Arrangements

We did not have any off-balance sheet arrangements as of December 31, 2023.

Back to the ASTS company profile or the MD&A index.