grepcent public filings, reorganized for comparison

NextDecade Corp (NEXT)

CIK: 0001612720. SIC: 4923 Natural Gas Transmisison & Distribution. Latest 10-K as of: 2026-03-02.

SIC breadcrumb: Transportation, Communications, Electric, Gas, And Sanitary Services > Electric, Gas, And Sanitary Services > SIC 4923 Natural Gas Transmisison & Distribution

SEC company page: https://www.sec.gov/edgar/browse/?CIK=1612720. Latest filing source: 0001612720-26-000009.

Informational only. Descriptive public-record data — not a rating, forecast, or investment advice. See Disclaimer.

At a glance

No standardized annual SEC companyfacts metrics were extracted for this company; the at-a-glance panel is omitted rather than estimated.

No market price, no rating, no forecast on this site. Not investment advice.

Peer & cluster context

Peer percentile fingerprint

NEXT ratios vs SIC peers. Source: grepcent computed from latest SEC companyfacts ratios; peer set SIC major-group 49; per-ratio N printed.NEXT ratios vs SIC peers. Source: grepcent computed from latest SEC companyfacts ratios; peer set SIC major-group 49; per-ratio N printed.RatioNEXTPeer medianPercentileNROE-450.6%9.2%089ROA-3.5%2.7%791Liabilities / equity12.342.329889Current ratio0.540.801091

Percentile = share of the N covered peers reporting that ratio whose value is lower (ties counted half); computed among grepcent-covered companies in SIC major-group 49 Electric, Gas, And Sanitary Services, not the whole market. A higher percentile means a higher value of the ratio, not a better company. Ratios with fewer than 8 reporting peers are omitted. Latest reported values per company; fiscal periods may differ. Descriptive arithmetic - not a score, rating, or ranking.

Selected Fundamentals

MetricValueUnitFYFiled
Net income-429,637,000USD20252026-03-02
Assets12,425,828,000USD20252026-03-02

Financials

Annual standardized facts from SEC companyfacts as of latest extracted filing date 2026-03-02. Source: https://data.sec.gov/api/xbrl/companyfacts/CIK0001612720.json. Derived margins, ratios, and free cash flow are computed from the extracted annual SEC facts.

Download these verified figures (annual + quarterly, with per-value filing provenance): JSON · CSV

Flow metrics use full-year FY periods from 10-K/10-K/A filings; balance-sheet metrics use FY-end instants. Free cash flow = operating cash flow - capital expenditures. Missing metrics are omitted rather than fabricated.

Metric2016201720182019202020212022202320242025
Net income-434,698-35,326,000-41,960,000-35,871,000-14,329,000-22,039,000-60,071,000-221,640,000277,447,000-429,637,000
Operating income-8,502,000-35,638,000-43,015,000-35,001,000-22,012,000-19,507,000-54,475,000-122,668,000-171,075,000-225,931,000
Diluted EPS-0.65-0.94-0.24-1.17
Operating cash flow-7,190,000-12,830,000-23,285,000-40,700,000-26,253,000-17,960,000-40,076,000-73,620,000-95,585,000-169,397,000
Capital expenditures19,392,00014,833,00018,658,00020,303,00032,352,00012,105,00033,753,0001,737,636,0002,567,801,0004,846,807,000
Share buybacks35,000650,000346,000284,0003,272,0009,627,0006,702,00016,946,000
Assets75,777,000116,091,000169,002,000221,195,000201,668,000222,105,000312,430,0003,323,801,0006,404,059,00012,425,828,000
Liabilities7,679,00012,999,00019,531,00033,580,00028,933,00033,813,00055,616,0002,583,367,0004,659,673,00010,124,741,000
Stockholders' equity68,098,000103,092,00083,221,00089,717,00060,432,00019,892,00054,371,000287,923,000377,641,00095,338,000
Cash and cash equivalents12,524,00035,703,0003,169,00015,736,00022,608,00025,552,00062,789,00038,241,000148,137,000143,782,000
Free cash flow-26,582,000-27,663,000-41,943,000-61,003,000-58,605,000-30,065,000-73,829,000-1,811,256,000-2,663,386,000-5,016,204,000

Ratios

ROE and ROA use period-end equity/assets. Liabilities / equity uses total liabilities divided by stockholders' equity. Current ratio uses current assets divided by current liabilities when both are reported.

Metric2016201720182019202020212022202320242025
Return on equity-0.64%-34.27%-50.42%-39.98%-23.71%-110.79%-110.48%-76.98%73.47%-450.65%
Return on assets-0.57%-30.43%-24.83%-16.22%-7.11%-9.92%-19.23%-6.67%4.33%-3.46%
Liabilities / equity0.110.130.230.370.481.701.028.9712.34
Current ratio3.895.106.363.664.533.212.520.570.690.54

Industry Peer Context

Each number-line places NEXT against the min, median, and max of latest reported values among companies in the same SIC industry when at least three peers report that ratio.

ROE peer context

NEXT ROE versus SIC peer range. Source: grepcent computed from latest SEC companyfacts ratios for SIC industry 4923; peer count 6.NEXT ROE versus SIC peer range. Source: grepcent computed from latest SEC companyfacts ratios for SIC industry 4923; peer count 6.6 SIC peersMin -450.6%Median 9.9%Max 15.1%NEXT -450.6%

ROA peer context

NEXT ROA versus SIC peer range. Source: grepcent computed from latest SEC companyfacts ratios for SIC industry 4923; peer count 6.NEXT ROA versus SIC peer range. Source: grepcent computed from latest SEC companyfacts ratios for SIC industry 4923; peer count 6.6 SIC peersMin -3.5%Median 3.8%Max 5.1%NEXT -3.5%

Financial Bridges

Waterfall figures reconcile reported SEC companyfacts components. Missing bridges are omitted when required components are not present for the same fiscal year.

Free cash flow = operating cash flow - capital expenditures

NEXT FY2025 free cash flow bridge from reported figures.NEXT FY2025 free cash flow bridge from reported figures.NEXT free cash flow bridgeFY2025: operating cash flow less capital expendituresSource: SEC companyfacts FY2025.Free cash flow bridgeReported amount-$6.0B$0.0B$250.0M-$169.4MOperating cash flow-$4.8BCapex-$5.0BFree cash flow

Figure provenance: SEC companyfacts FY 2025. Operating cash flow: accession 0001612720-26-000009; concept NetCashProvidedByUsedInOperatingActivities; source concepts us-gaap:NetCashProvidedByUsedInOperatingActivities | Capital expenditures: accession 0001612720-26-000009; concept PaymentsToAcquirePropertyPlantAndEquipment; source concepts us-gaap:PaymentsToAcquirePropertyPlantAndEquipment | Free cash flow: accession 0001612720-26-000009; concept NetCashProvidedByUsedInOperatingActivities - PaymentsToAcquirePropertyPlantAndEquipment; source concepts us-gaap:NetCashProvidedByUsedInOperatingActivities; us-gaap:PaymentsToAcquirePropertyPlantAndEquipment

Financial Charts

NEXT net income, last 5 periods. Source: SEC companyfacts FY2025.NEXT net income, last 5 periods. Source: SEC companyfacts FY2025.NEXT Net incomeLatest point: FY2025 = -$429.6MSource: SEC companyfacts FY2025.Fiscal yearNet income-$500.0M$0.0B$500.0MFY2021FY2022FY2023FY2024FY2025

Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001612720-26-000009; filed 2026-03-02. Concept: NetIncomeLoss. Source concepts: us-gaap:NetIncomeLoss.

NEXT operating income, last 5 periods. Source: SEC companyfacts FY2025.NEXT operating income, last 5 periods. Source: SEC companyfacts FY2025.NEXT Operating incomeLatest point: FY2025 = -$225.9MSource: SEC companyfacts FY2025.Fiscal yearOperating income-$250.0M-$125.0M$0.0BFY2021FY2022FY2023FY2024FY2025

Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001612720-26-000009; filed 2026-03-02. Concept: OperatingIncomeLoss. Source concepts: us-gaap:OperatingIncomeLoss.

NEXT diluted eps, last 4 periods. Source: SEC companyfacts FY2025.NEXT diluted eps, last 4 periods. Source: SEC companyfacts FY2025.NEXT Diluted EPSLatest point: FY2025 = -$1.17/shareSource: SEC companyfacts FY2025.Fiscal yearDiluted EPS (USD/share)-$1.50/share-$0.75/share$0.00/shareFY2022FY2023FY2024FY2025

Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001612720-26-000009; filed 2026-03-02. Concept: EarningsPerShareDiluted. Source concepts: us-gaap:EarningsPerShareDiluted.

NEXT operating cash flow, last 5 periods. Source: SEC companyfacts FY2025.NEXT operating cash flow, last 5 periods. Source: SEC companyfacts FY2025.NEXT Operating cash flowLatest point: FY2025 = -$169.4MSource: SEC companyfacts FY2025.Fiscal yearOperating cash flow-$250.0M-$125.0M$0.0BFY2021FY2022FY2023FY2024FY2025

Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001612720-26-000009; filed 2026-03-02. Concept: NetCashProvidedByUsedInOperatingActivities. Source concepts: us-gaap:NetCashProvidedByUsedInOperatingActivities.

NEXT capital expenditures, last 5 periods. Source: SEC companyfacts FY2025.NEXT capital expenditures, last 5 periods. Source: SEC companyfacts FY2025.NEXT Capital expendituresLatest point: FY2025 = $4.8BSource: SEC companyfacts FY2025.Fiscal yearCapital expenditures$0.0B$3.0B$6.0BFY2021FY2022FY2023FY2024FY2025

Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001612720-26-000009; filed 2026-03-02. Concept: PaymentsToAcquirePropertyPlantAndEquipment. Source concepts: us-gaap:PaymentsToAcquirePropertyPlantAndEquipment.

NEXT share buybacks, last 5 periods. Source: SEC companyfacts FY2025.NEXT share buybacks, last 5 periods. Source: SEC companyfacts FY2025.NEXT Share buybacksLatest point: FY2025 = $16.9MSource: SEC companyfacts FY2025.Fiscal yearShare buybacks$0.0B$125.0M$250.0MFY2021FY2022FY2023FY2024FY2025

Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001612720-26-000009; filed 2026-03-02. Concept: PaymentsForRepurchaseOfCommonStock. Source concepts: us-gaap:PaymentsForRepurchaseOfCommonStock.

NEXT assets, last 5 periods. Source: SEC companyfacts FY2025.NEXT assets, last 5 periods. Source: SEC companyfacts FY2025.NEXT AssetsLatest point: FY2025 = $12.4BSource: SEC companyfacts FY2025.Fiscal yearAssets$0.0B$10.0B$20.0BFY2021FY2022FY2023FY2024FY2025

Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001612720-26-000009; filed 2026-03-02. Concept: Assets. Source concepts: us-gaap:Assets.

NEXT liabilities, last 5 periods. Source: SEC companyfacts FY2025.NEXT liabilities, last 5 periods. Source: SEC companyfacts FY2025.NEXT LiabilitiesLatest point: FY2025 = $10.1BSource: SEC companyfacts FY2025.Fiscal yearLiabilities$0.0B$10.0B$20.0BFY2021FY2022FY2023FY2024FY2025

Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001612720-26-000009; filed 2026-03-02. Concept: Liabilities. Source concepts: us-gaap:Liabilities.

NEXT stockholders' equity, last 5 periods. Source: SEC companyfacts FY2025.NEXT stockholders' equity, last 5 periods. Source: SEC companyfacts FY2025.NEXT Stockholders' equityLatest point: FY2025 = $95.3MSource: SEC companyfacts FY2025.Fiscal yearStockholders' equity$0.0B$250.0M$500.0MFY2021FY2022FY2023FY2024FY2025

Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001612720-26-000009; filed 2026-03-02. Concept: StockholdersEquity. Source concepts: us-gaap:StockholdersEquity.

NEXT cash and cash equivalents, last 5 periods. Source: SEC companyfacts FY2025.NEXT cash and cash equivalents, last 5 periods. Source: SEC companyfacts FY2025.NEXT Cash and cash equivalentsLatest point: FY2025 = $143.8MSource: SEC companyfacts FY2025.Fiscal yearCash and cash equivalents$0.0B$125.0M$250.0MFY2021FY2022FY2023FY2024FY2025

Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001612720-26-000009; filed 2026-03-02. Concept: CashAndCashEquivalentsAtCarryingValue. Source concepts: us-gaap:CashAndCashEquivalentsAtCarryingValue.

NEXT free cash flow, last 5 periods. Source: SEC companyfacts FY2025.NEXT free cash flow, last 5 periods. Source: SEC companyfacts FY2025.NEXT Free cash flowLatest point: FY2025 = -$5.0BSource: SEC companyfacts FY2025.Fiscal yearFree cash flow-$6.0B-$3.0B$0.0BFY2021FY2022FY2023FY2024FY2025

Figure provenance: SEC companyfacts. Latest point: FY 2025 ended 2025-12-31; accession 0001612720-26-000009; filed 2026-03-02. Concept: NetCashProvidedByUsedInOperatingActivities - PaymentsToAcquirePropertyPlantAndEquipment. Source concepts: us-gaap:NetCashProvidedByUsedInOperatingActivities; us-gaap:PaymentsToAcquirePropertyPlantAndEquipment.

As-reported value updates

6 tracked differences above grepcent's stated thresholds were found between the earliest XBRL-filed value and the value currently on file for the same fiscal period.

View the filing-by-filing ledger →

Quarterly

Quarterly standardized facts from SEC companyfacts as of latest extracted filing date 2026-07-30. Source: https://data.sec.gov/api/xbrl/companyfacts/CIK0001612720.json.

Flow metrics use discrete quarter-length periods from 10-Q/10-Q/A filings. Q4 revenue and net income are derived only when annual FY and nine-month YTD facts exist for the same fiscal year; derived Q4 values are labeled. EPS Q4 is not derived.

QuarterEnd DateRevenueNet IncomeDiluted EPSMethod
2023-Q32023-09-300.00181,844,0000.48reported discrete quarter
2023-Q42023-12-310.00-255,848,000derived Q4 = FY annual - nine-month YTD
2024-Q12024-03-310.00186,775,0000.11reported discrete quarter
2024-Q22024-06-300.002,304,000-0.13reported discrete quarter
2024-Q32024-09-300.00-393,075,000-0.47reported discrete quarter
2024-Q42024-12-310.00481,443,000derived Q4 = FY annual - nine-month YTD
2025-Q12025-03-310.00-245,228,000-0.34reported discrete quarter
2025-Q22025-06-300.00-70,632,000-0.23reported discrete quarter
2025-Q32025-09-300.00-184,756,000-0.42reported discrete quarter
2025-Q42025-12-310.0070,979,000derived Q4 = FY annual - nine-month YTD
2026-Q12026-03-310.00-195,040,000-0.51reported discrete quarter
2026-Q22026-06-300.00-60,183,000-0.25reported discrete quarter

Quarterly Charts

NEXT quarterly revenue, last 12 periods. Source: SEC companyfacts 2026-Q2.NEXT quarterly revenue, last 12 periods. Source: SEC companyfacts 2026-Q2.NEXT Quarterly RevenueLatest point: 2026-Q2 = $0.0BSource: SEC companyfacts 2026-Q2.Fiscal quarterQuarterly Revenue$0.0B$125.0M$250.0M2023-Q32023-Q42024-Q12024-Q22024-Q32024-Q42025-Q12025-Q22025-Q32025-Q42026-Q12026-Q2

Figure provenance: SEC companyfacts. Latest point: FY 2026 ended 2026-06-30; accession 0001612720-26-000049; filed 2026-07-30. Concept: Revenues. Source concepts: us-gaap:Revenues.

NEXT quarterly net income, last 12 periods. Source: SEC companyfacts 2026-Q2.NEXT quarterly net income, last 12 periods. Source: SEC companyfacts 2026-Q2.NEXT Quarterly Net incomeLatest point: 2026-Q2 = -$60.2MSource: SEC companyfacts 2026-Q2.Fiscal quarterQuarterly Net income-$500.0M$0.0B$750.0M2023-Q32023-Q42024-Q12024-Q22024-Q32024-Q42025-Q12025-Q22025-Q32025-Q42026-Q12026-Q2

Figure provenance: SEC companyfacts. Latest point: FY 2026 ended 2026-06-30; accession 0001612720-26-000049; filed 2026-07-30. Concept: ProfitLoss. Source concepts: us-gaap:ProfitLoss.

NEXT quarterly diluted eps, last 9 periods. Source: SEC companyfacts 2026-Q2.NEXT quarterly diluted eps, last 9 periods. Source: SEC companyfacts 2026-Q2.NEXT Quarterly Diluted EPSLatest point: 2026-Q2 = -$0.25/shareSource: SEC companyfacts 2026-Q2.Fiscal quarterQuarterly Diluted EPS (USD/share)-$1.00/share$0.00/share$1.00/share2023-Q32024-Q12024-Q22024-Q32025-Q12025-Q22025-Q32026-Q12026-Q2

Figure provenance: SEC companyfacts. Latest point: FY 2026 ended 2026-06-30; accession 0001612720-26-000049; filed 2026-07-30. Concept: EarningsPerShareDiluted. Source concepts: us-gaap:EarningsPerShareDiluted.

Business

Read NEXT's verbatim Item 1 Business section from its latest 10-K: Business.

Risk Factors

Read NEXT's verbatim Item 1A Risk Factors from its latest 10-K: Risk Factors.

Latest quarter (10-Q)

Latest 10-Q source: 0001612720-26-000049.

Extracted structurally from real Item 2 body heading to real Item 3/4 boundary. Published MD&A gate trimmed front/tail over-capture. Confidence: high. Filing date: 2026-07-30. Report date: 2026-06-30.

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Forward-Looking Statements

This Quarterly Report on Form 10-Q contains certain statements that are, or may be deemed to be, "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”). All statements other than statements of historical fact contained in this Quarterly Report on Form 10-Q, including statements regarding our future results of operations and financial position, strategy and plans, and our expectations for future operations and economic performance, are forward-looking statements. The words “anticipate,” “contemplate,” “estimate,” “expect,” “project,” “plan,” “intend,” “believe,” “seek,” “may,” “might,” “will,” “would,” “could,” “should,” “can have,” “likely,” “continue,” “design,” “assume,” “budget,” “forecast,” “target,” and other words and terms of similar expressions, are intended to identify forward-looking statements.

We have based these forward-looking statements on assumptions and analysis made by us in light of our current expectations, perceptions of historical trends, current conditions and projections about future events and trends that we believe may affect our financial condition, results of operations, strategy, short-term and long-term business operations and objectives and financial needs.

Although we believe that the expectations reflected in our forward-looking statements are reasonable, actual results could differ from those expressed in our forward-looking statements. Our future financial position and results of operations, as well as any forward-looking statements, are subject to change and inherent risks and uncertainties, including those described in the section titled “Risk Factors” in our most recent Annual Report on Form 10-K as supplemented by Item 1A of this Quarterly Report on Form 10-Q. You should consider our forward-looking statements in light of a number of factors that may cause actual results to vary from our forward-looking statements including, but not limited to:

•our progress in the development of our natural gas liquefaction and liquefied natural gas (“LNG”) export project and the timing of that progress;

•the timing and cost of the development, construction and operation of the first five liquefaction trains and related common facilities of the multi-plant integrated natural gas liquefaction and LNG export facility located at the Port of Brownsville in southern Texas (the “Rio Grande LNG Facility”);

•the availability and frequency of cash distributions available to us from the Joint Ventures, which own Phase 1, Train 4, and Train 5 of the Rio Grande LNG Facility;

•the timing and cost of the development of subsequent liquefaction trains at the Rio Grande LNG Facility;

•the ability to generate sufficient cash flow to satisfy our and our subsidiaries’ significant debt service obligations or to refinance such obligations ahead of their maturity;

•restrictions imposed by our or our subsidiaries’ debt agreements that limit flexibility in operating our business;

•increases in interest rates increasing the cost of servicing indebtedness;

•our reliance on third parties to successfully complete the Rio Grande LNG Facility and related pipelines and other infrastructure;

•our ability to secure additional debt and equity financing in the future, including any refinancing of outstanding indebtedness, on commercially acceptable terms;

•the accuracy of estimated costs for the Rio Grande LNG Facility;

•our ability to achieve operational characteristics of the Rio Grande LNG Facility, when completed, including amounts of liquefaction capacities, and any differences in such operational characteristics from our expectations;

•the development risks, operational hazards, and regulatory approvals applicable to the Rio Grande LNG Facility, our LNG, construction and operation activities and those of our third-party contractors and counterparties;

•the ability to obtain or maintain governmental approvals to construct or operate the Rio Grande LNG Facility;

•technological innovation which may lessen our anticipated competitive advantage or demand for our offerings;

•the global demand for and price of LNG;

•the availability of LNG vessels worldwide;

•changes in legislation and regulations relating to the LNG industry, including environmental laws and regulations that impose significant compliance costs and liabilities;

•global pandemics, the Russia-Ukraine conflict, conflicts in the Middle East, other sources of volatility in the energy markets and their impact on our business and operating results, including any disruptions in our operations or development of the Rio Grande LNG Facility and the health and safety of our employees, and on our customers, the global economy and the demand for LNG;

•risks related to doing business in and having counterparties in foreign countries, including as a result of tariffs;

15

Table of Contents

•our ability to maintain the listing of our securities on the Nasdaq Capital Market or another securities exchange or quotation medium;

•changes adversely affecting the businesses in which we are engaged;

•management of growth;

•general economic conditions, including inflation and rising interest rates;

•our ability to generate cash; and

•the result of future financing efforts and applications for customary tax incentives.

Should one or more of the foregoing risks or uncertainties materialize in a way that negatively impacts us, or should the assumptions underlying our forward-looking statements prove incorrect, our actual results may vary materially from those anticipated in our forward-looking statements, and our business, financial condition, and results of operations could be materially and adversely affected.

The forward-looking statements contained in this Quarterly Report on Form 10-Q are made as of the date of this Quarterly Report on Form 10-Q. You should not rely upon forward-looking statements as predictions of future events. In addition, neither we nor any other person assumes responsibility for the accuracy and completeness of any of these forward-looking statements. Except as required by applicable law, we do not undertake any obligation to publicly correct or update any forward-looking statement.

All forward-looking statements attributable to us are expressly qualified in their entirety by these cautionary statements as well as others made in our most recent Annual Report on Form 10-K as well as other filings we have made and will make with the Securities and Exchange Commission (the “SEC”) and our public communications. You should evaluate all forward-looking statements made by us in the context of these risks and uncertainties.

Overview of Business and Significant Developments

Overview of Business

NextDecade Corporation, a Delaware corporation, is a Houston-based energy company primarily engaged in construction and development activities related to the liquefaction of natural gas and sale of LNG. We are constructing and developing a natural gas liquefaction and export facility located in the Rio Grande Valley near Brownsville, Texas (the “Rio Grande LNG Facility”). The first five liquefaction trains and related infrastructure (together, “Phase 1”, “Train 4”, and “Train 5”) at the Rio Grande LNG Facility are currently under construction. We are also developing and advancing the permitting process for expansion Trains 6 through 8 at the Rio Grande LNG Facility.

We are focused on constructing and operating the Rio Grande LNG Facility safely, efficiently, on schedule, and on budget. We seek to deliver secure, affordable, and cleaner energy through the development and operation of liquefaction capacity at the Rio Grande LNG Facility.

Significant Recent Developments

Significant developments since January 1, 2026 include the following:

Construction and Commissioning

•Progress on Trains 1 through 5 under the engineering, procurement, and construction (“EPC”) contracts with Bechtel Energy, Inc. (“Bechtel”) as of June 2026 consisted of:

Overall Completion PercentageEngineeringProcurementConstructionCommissioning
Trains 1 and 274.0%99.1%97.8%58.9%0.6%
Train 350.4%96.5%90.2%17.4%
Train 415.5%69.4%25.4%1.4%
Train 59.4%26.8%19.3%

•We safely energized our main substation with 138kV power in May, and we seconded over 100 operational employees to Bechtel in June as part of preparations for first LNG production. We continue to expect first gas into the Rio Grande LNG Facility in the second half of 2026 and first LNG production from Train 1 in the first half of 2027.

16

Table of Contents

Development

•In May 2026, we filed a formal application with the Federal Energy Regulatory Commission (“FERC”) for expansion at the Rio Grande LNG Facility that includes Train 6 and an additional marine berth. With the application, we requested a waiver from FERC of the approximately one month remaining in the Train 6 pre-filing period, and FERC granted that waiver in June 2026.

•In June 2026, we filed an application with the Department of Energy for LNG export authorizations for Train 6.

•In June 2026, we executed a Reservation Agreement with Baker Hughes for the supply of main refrigeration compressors for Train 6.

Strategic and Commercial

◦In early 2026, we began the marketing of early cargoes that we expect to produce prior to the commencement of our long-term LNG Sale and Purchase Agreements (“SPAs”). In February 2026, we entered into LNG sales agreements for the sale of over 175 TBtu of LNG on a free-on-board (“FOB”) basis, with fixed liquefaction fees that are expected to achieve a cargo margin, calculated as the FOB LNG sales price less our expected costs of natural gas feedstock and fuel, of over $3.00 per MMBtu. This volume represents 33% of our expected portfolio volumes from 2027 through early 2029.

Financial

◦In April 2026, Rio Grande LNG Train 5, LLC issued a second installment of $100.0 million and in July 2026 issued a third installment of $100.0 million of 6.56% Senior Secured Notes due in 2050, pursuant to the Note Purchase Agreement entered into in conjunction with the positive final investment decision on Train 5 in October 2025, for the issuance of $500.0 million aggregate senior secured notes. As of July 29, 2026, $350 million of these notes were issued and outstanding.

◦In June 2026, Rio Grande LNG Intermediate HoldCo Borrower, LLC (“Phase 1 HoldCo Borrower”) entered into a credit agreement for a $1.0 billion term loan which bears interest at 7.05%, payable in cash or in-kind at our election until the first interest payment date after June 2029 and in cash thereafter, and matures in June 2033. Net proceeds from this term loan were used to reduce outstanding borrowings under the Rio Grande LNG, LLC (“Phase 1 LLC”) credit facilities, to pay fees and expenses associated with the transaction, and to pay general and administrative expenses of Phase 1 HoldCo Borrower.

◦In July 2026, Phase 1 LLC completed an offering of $3.5 billion aggregate principal amount of senior secured notes. The net proceeds from the offering were used to repay approximately $3.5 billion of outstanding borrowings under the Phase 1 LLC credit facilities and to pay fees and expenses associated with the transaction. The tranches of senior secured notes issued were:

▪$1.0 billion aggregate principal amount of senior secured notes due 2031, which bear interest at 5.25% and will mature in June 2031,

▪$500.0 million aggregate principal amount of senior secured notes due 2034, which bear interest at 5.50% and will mature in January 2034,

▪$1.25 billion aggregate principal amount of senior se

[Excerpt truncated for page length; source filing is linked above.]

Latest 10-K MD&A (excerpt)

Latest 10-K Item 7 source: 0001612720-26-000009. The complete FY 2025 MD&A is published at /company/NEXT/mda/fy2025/.

Extracted structurally from real Item 7 body heading to real Item 7A/8 boundary. Confidence: high. Filing date: 2026-03-02. Report date: 2025-12-31.

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.

Introduction

The following discussion and analysis presents management’s view of our business, financial condition and overall performance and should be read in conjunction with our Consolidated Financial Statements and the accompanying notes in “Financial Statements and Supplementary Data.” This information is intended to provide investors with an understanding of our past performance, current financial condition and outlook for the future. Discussion of items for the year ended December 31, 2023, including drivers of variances between the year ended December 31, 2024 and the year ended December 31, 2023, are not included herein and can be found in “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in our annual report on Form 10-K for the fiscal year ended December 31, 2024.

Our discussion and analysis includes the following subjects:

•Overview of Business

•Overview of Significant Events

•Liquidity and Capital Resources

•Contractual Obligations

•Results of Operations

•Summary of Critical Accounting Estimates

•Recent Accounting Standards

29

Overview of Business

NextDecade Corporation, a Delaware corporation, is a Houston-based energy company primarily engaged in construction and development activities related to the liquefaction of natural gas and sale of LNG. We are constructing and developing a natural gas liquefaction and export facility located in the Rio Grande Valley near Brownsville, Texas (the “Rio Grande LNG Facility”). The first five liquefaction trains and related infrastructure (together, “Phase 1”, “Train 4”, and “Train 5”) at the Rio Grande LNG Facility are currently under construction. We are also developing and advancing the permitting process for expansion Trains 6 through 8 and exploring a potential carbon capture and storage ("CCS") project at the Rio Grande LNG Facility.

Overview of Significant Events

Significant developments since January 1, 2025 and through the date of this 10-K include the following:

Development and Construction

•Under the engineering, procurement, and construction (“EPC”) contracts with Bechtel Energy, Inc. (“Bechtel”), as of January 2026:

•The overall project completion percentage for Trains 1 and 2 and the common facilities at the Rio Grande LNG Facility was 64.5%. Within this project completion percentage, engineering was 97.8% complete, procurement was 94.0% complete, and construction was 42.9% complete.

•The overall project completion percentage for Train 3 at the Rio Grande LNG Facility was 39.8%. Within this project completion percentage, engineering was 88.0% complete, procurement was 75.6% complete, and construction was 8.5% complete.

•The overall project completion percentage for Train 4 at the Rio Grande LNG Facility was 7.8%. Within this project completion percentage, engineering was 28.1% complete, procurement was 15.1% complete, and construction was 0.0% complete.

•The overall project completion percentage for Train 5 at the Rio Grande LNG Facility was 3.3%. Progress since the positive final investment decision (“FID”) on Train 5 in October 2025 has primarily focused on procurement.

•In February 2025, we provided additional information regarding our development of Trains 6 through 8 at the Rio Grande LNG Facility. Trains 6 through 8 are currently wholly owned by NextDecade and are cumulatively expected to increase the Company's total liquefaction capacity by approximately 18 million tonnes per annum ("MTPA") once constructed and placed into operation.

◦Train 6, which has an expected LNG production capacity of approximately 6 MTPA, is being developed inside the existing levee at the site and adjacent to Trains 1 through 5. In November 2025, we initiated the pre-filing process with the Federal Energy Regulatory Commission ("FERC") for expansion at the Rio Grande LNG Facility that includes Train 6 and an additional marine berth, and we expect to file a full FERC application for this expansion in mid-2026.

◦We are evaluating multiple areas on the site for the development of Trains 7 and 8, which have a total expected LNG production capacity of approximately 12 MTPA. We expect to advance the development of Trains 7 and 8 throughout 2026.

•On September 9, 2025, we announced a positive FID on Train 4 and related infrastructure at the Rio Grande LNG Facility and issued full notice to proceed ("NTP") to Bechtel under the EPC contract for Train 4. Total project costs for Train 4 and related infrastructure are expected to total approximately $6.7 billion. Train 4 has an expected LNG production capacity of approximately 6 MTPA, and guaranteed substantial completion of Train 4 is in the third quarter of 2030.

•On October 16, 2025, we announced a positive FID on Train 5 and related infrastructure at the Rio Grande LNG Facility and issued full NTP to Bechtel under the EPC contract for Train 5. Total project costs for Train 5 and related infrastructure are expected to total approximately $6.7 billion. Train 5 has an expected LNG production capacity of approximately 6 MTPA, and guaranteed substantial completion of Train 5 is in the second quarter of 2031.

•In March 2026, we announced that we expect to begin commissioning activities at the Rio Grande LNG Facility in 2026, and we expect first LNG production from Train 1 in the first half of 2027.

Strategic and Commercial

•In April 2025, we announced a 20-year LNG Sale and Purchase Agreement (“SPA”) with a subsidiary of Saudi Aramco (“Aramco”), pursuant to which the Aramco subsidiary will purchase 1.2 MTPA of LNG from Train 4 at the Rio Grande LNG Facility for 20 years, on a free on board (“FOB”) basis at a price indexed to Henry Hub.

30

•In April 2025, we announced TotalEnergies’ exercise of its LNG purchase option with respect to Train 4 and the execution of a 20-year LNG SPA with TotalEnergies, pursuant to which TotalEnergies will purchase 1.5 MTPA of LNG from Train 4 at the Rio Grande LNG Facility for 20 years, on an FOB basis at a price indexed to Henry Hub.

•In May 2025, we announced a 20-year LNG SPA with JERA, pursuant to which JERA will purchase 2.0 MTPA of LNG from Train 5 at the Rio Grande LNG Facility for 20 years, on an FOB basis at a price indexed to Henry Hub.

•In June 2025, we finalized a pricing refresh of the Company's lump-sum, turnkey EPC contract with Bechtel for the construction of Train 4 and related infrastructure and executed a lump-sum, turnkey EPC contract with Bechtel for the construction of Train 5 and related infrastructure.

•In September 2025, we announced a 20-year LNG SPA with EQT Corporation ("EQT"), pursuant to which EQT will purchase 1.5 MTPA of LNG from Train 5 at the Rio Grande LNG Facility for 20 years, on an FOB basis at a price indexed to Henry Hub.

•In September 2025, we announced a 20-year LNG SPA with ConocoPhillips, pursuant to which ConocoPhillips will purchase 1.0 MTPA of LNG from Train 5 at the Rio Grande LNG Facility for 20 years, on an FOB basis at a price indexed to Henry Hub.

•In early 2026, we began the marketing of early cargoes that we expect to produce in 2027 and 2028 prior to the commencement of our long-term LNG SPAs. We have entered into LNG sales agreements for the sale of over 175 TBtu of LNG on an FOB basis, with fixed liquefaction fees that are expected to achieve a cargo margin, calculated as the FOB LNG sales price less our expected costs of natural gas feedstock and fuel, of over $3.00 per MMBtu. This volume represents 33% of our expected open volumes from 2027 through early 2029.

Financial

•In April 2025, Phase 1 LLC elected to terminate $250 million of commitments under its working capital facility due to a decrease in expected requirements for credit support during construction, which reduced the outstanding commitments under the working capital facility to $250 million and is expected to reduce related commitment fees by approximately $2 million annually.

•In May 2025, our wholly owned subsidiary Rio Grande LNG Super Holdings, LLC, entered into an amendment to the credit agreement with the lender of its existing senior secured loan (the "Super Holdings Loan") to increase the loan amount by $50 million to a total of $225 million initial principal. Incremental proceeds from the Super Holdings Loan were disbursed at closing on May 14, 2025, and net proceeds were used to fund working capital and general corporate purposes, including pre-FID expenses for Trains 4 and 5 and development expenses for expansion trains at the Rio Grande LNG Facility.

•In conjunction with the closing of the May 2025 amendment to the Super Holdings Loan, we issued warrants that are exercisable for an aggregate of approximately 2.0 million shares of our common stock to the lenders of the Super Holdings Loan. The warrants are exercisable at $9.30 per share, which represented a 30% premium to the volume weighted average price for the 30 trading-day period immediately preceding the amendment date.

•On September 9, 2025, in conjunction with the positive FID on Train 4 at the Rio Grande LNG Facility, we and certain of our subsidiaries closed an approximately $6.7 billion project financing for Train 4, which included the closing of:

◦A joint venture agreement which included approximately $1.69 billion of financial commitments from Global Infrastructure Partners, a part of BlackRock ("GIP"), GIC, Mubadala Investment Company, and TotalEnergies;

◦A commitment by the Company to invest approximately $1.13 billion in Train 4; and

◦A senior secured, non-recourse bank credit facility of $3.85 billion with a seven-year maturity.

•On September 9, 2025, to fully fund the Company's approximately $1.13 billion equity commitments for Train 4, certain of our wholly owned subsidiaries entered into a delayed draw, senior secured term loan bank facility of $734 million with a five-year maturity (the "FinCo Loan") and term loans of $600 million with a maturity date of the earlier of eight years or the 85th day prior to the maturity date of the FinCo Loan (the "SuperFinCo Loan").

•On October 16, 2025, in conjunction with the positive FID on Train 5 at the Rio Grande LNG Facility, we and certain of our subsidiaries closed an approximately $6.7 billion project financing for Train 5, which included the closing of:

◦A joint venture agreement which included approximately $1.29 billion of financial commitments from GIP, GIC, and Mubadala Investment Company;

◦A commitment by the Company to invest approximately $1.29 billion in Train 5;

◦A senior secured, non-recourse bank credit facility of $3.59 billion with a seven-year maturity; and

◦An offering of $500 million senior secured, non-recourse private placement notes, which will bear interest at 6.56%, will be funded in multiple tranches from December 2025 through October 2026, and will amortize over a period of 20 years beginning in September 2031, with a final maturity in September 2050. In December 2025, the Company issued the first tranche of $150 million of these notes.

31

•On October 16, 2025, to fully fund the Company's approximately $1.29 billion equity commitments for Train 5, we contributed $233 million cash to Train 5 LLC, and certain of our wholly owned subsidiaries increased the size of the FinCo Loan by $729 million, to a total of approximately $1.46 billion, and increased the size of the SuperFinCo Loan by $600 million, to a total of $1.2 billion.

•In November 2025, Rio Grande LNG Super Holdings, LLC entered into an Amended and Restated Credit Agreement with the lenders of the Super Holdings Loan to refinance $50 million of the existing loan amount and provide $50 million of incremental capital in the form of an exchangeable loan with total initial principal of $100 million (the "Exchangeable Loan"). The Exchangeable Loan bears interest at 8%, payable in cash or in-kind at the Company's election, and matures in November 2030. The i

[Excerpt truncated for page length; the complete text is on the linked full-MD&A page.]

Read the full FY 2025 MD&A or browse all MD&A years.

MD&A history

Prior-year 10-K MD&A spans are extracted from SEC filings with the same bounded parser used for the latest filing. Each year's full verbatim text is on its own sub-page.

Macro cross-references for NEXT

Indicators mapped to this company's SIC classification (industry 4923 Natural Gas Transmisison & Distribution) by grepcent's deterministic macro-sector crosswalk. A navigational mapping, not a statistical or causal claim.

Macro-to-micro threads including this sector: Money & trade, Trade & external.

All 71 macro indicators →

For LLMs & downloads

Markdown twin: /company/NEXT.md · JSON record: /company/NEXT.json · verified financials: JSON / CSV · machine TOC for the whole site: /llms.txt