URANIUM ENERGY CORP (UEC) FY 2024 MD&A
This page reproduces the company's own Item 7 MD&A text from the linked SEC filing. It is filer text, not grepcent analysis, scoring, or investment advice.
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations
(Expressed in thousands of U.S. dollars, except per share amounts)
The following management’s discussion and analysis of the Company’s financial condition and results of operations contain forward-looking statements that involve risks, uncertainties and assumptions including, among others, statements regarding our capital needs, business plans and expectations. In evaluating these statements, you should consider various factors, including the risks, uncertainties and assumptions set forth in reports and other documents we have filed with or furnished to the SEC and, including, without limitation, this Form 10-K filing for the fiscal year ended July 31, 2024, including the consolidated financial statements and related notes contained herein. These factors, or any one of them, may cause our actual results or actions in the future to differ materially from any forward-looking statement made in this document. Refer to “Cautionary Note Regarding Forward-looking Statements” and Item 1A. Risk Factors herein.
Introduction
The following discussion summarizes the results of operations for each of our fiscal years ended July 31, 2024, 2023 and 2022 and our financial condition as at July 31, 2024 and 2023, with a particular emphasis on Fiscal 2024, our most recently completed fiscal year.
Business
We have been primarily engaged in uranium mining and related activities, including exploration, pre-extraction, extraction and processing, on uranium projects located in the United States, Canada and the Republic of Paraguay.
During the fourth quarter of Fiscal 2024, we revised the financial information which our Chief Executive Officer, who is our chief operating decision maker ("CODM"), uses to evaluate performance and allocate resources. As a result, the Company’s reportable segments have been changed from one reportable segment to the following:
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | Mining segments |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| o | Wyoming |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| o | Texas |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| o | Saskatchewan |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| o | Others |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | Corporate and admin segment |
We utilize ISR mining for our uranium projects where possible which we believe, when compared to conventional open pit or underground mining, requires lower capital and operating expenditures with a shorter lead time to extraction and a reduced impact on the environment. We have two ISR Mines which utilize ISR mining to extract U3O8, or yellowcake. We have two uranium processing facilities located in the vicinity of our ISR Mines, which process material from our ISR Mines into drums of U3O8 for shipping to a third-party storage and sales facility. At July 31, 2024, we had no uranium supply or off-take agreements in place.
On January 16, 2024, we announced restarting uranium extraction at our fully permitted, and past producing, Christensen Ranch Mine ISR operation in Wyoming. The first extraction is expected prior to the end of our next quarter and will be funded with existing cash on the Company's balance sheet.
Uranium recovered from the Christensen Ranch Mine ISR Project will be processed at our Irigaray CPP. The Irigaray CPP is the hub central to our four fully permitted ISR projects located in the Powder River Basin of Wyoming, including our Christensen Ranch Mine, Reno Creek, Moore Ranch and Ludeman Projects. An application to increase the licensed capacity of the Irigaray CPP from the 2.5 million pounds of U3O8 per year to 4.0 million pounds of U3O8 per year was submitted to the WDEQ in November 2023; and approval is expected later in 2024. During August of 2024 we commenced the process for uranium extraction which is being funded with existing cash on the Company’s balance sheet.
104
Table of Contents
To enable a faster extraction restart, extensive preparations at the Christensen Ranch Mine wellfields and satellite processing plant were completed in 2023. This included the reinstallation of equipment, re-attachment of piping and a variety of electrical testing, repairs and upgrades to the existing facilities. Since that time, additional work has progressed, including the hiring of additional operational personnel, preparation of a detailed wellfield startup plan, final preparations for plant and wellfield operations and the installation of cased wells in two new wellfield header houses in Mine Unit 10 (Modules 10-7 and 10-8).
In Texas, our fully-licensed and 100% owned Hobson Processing Facility forms the basis for our regional operating strategy in the State of Texas, specifically the South Texas Uranium Belt where we utilize ISR mining. We utilize a “hub-and-spoke” strategy whereby the Hobson Processing Facility, which has a physical capacity to process uranium-loaded resins up to a total of 2.0 million pounds of U3O8 annually and is licensed to process up to four million pounds of U3O8 annually, acts as the central processing site (the “hub”) for our Palangana Mine, and future satellite uranium mining activities, such as our Burke Hollow and Goliad Projects, located within the South Texas Uranium Belt (the “spokes”).
On August 4, 2023, we acquired a portfolio of exploration-stage projects in the Athabasca Basin for CA$1.5 million from Rio Tinto Exploration Canada Inc., a subsidiary of Rio Tinto Inc. With this acquisition, we added an additional 44,444 acres of prospective ground in the Athabasca Basin to our existing portfolio.
We also hold certain mineral rights in various stages in the States of Arizona, New Mexico, Texas and Wyoming, and in Canada and in the Republic of Paraguay, many of which are located in historically successful mining areas and have been the subject of past exploration and pre-extraction activities by other mining companies.
Our operating and strategic framework is to become a leading low-cost North American focused uranium supplier based on expanding our uranium extraction activities, which includes advancing certain uranium projects with established mineralized materials towards uranium extraction and establishing additional mineralized materials on our existing uranium projects or through acquisition of additional uranium projects.
Key Issues
With the completion of the U1A Acquisition in December 2021, we expanded our footprint in Wyoming with our Wyoming hub-and-spoke operations. The acquisition of UEX in August 2022, and the acquisition of Roughrider Mineral Holdings Inc. in October 2022, further expanded our footprint in Canada and, in particular, the Athabasca Basin in Saskatchewan. In the meantime, we continue to establish additional uranium mines through exploration and pre-extraction activities and direct acquisitions in both the U.S. and Paraguay, all of which require us to manage numerous challenges, risks and uncertainties inherent in our business and operations as more fully described in Item 1A. Risk Factors herein.
Our operations are capital intensive, and we will require significant additional financing to continue with our exploration and pre-extraction activities and acquire additional uranium projects. Historically, we have been reliant primarily on equity financings from the sale of our common stock in order to fund our operation. For the years ended July 31, 2023 and 2022, we have also relied on cash flows generated from the sales of our purchased uranium inventories under our Physical Uranium Program to fund our operations, which resulted in total of $57.0 million in gross profits. However, we did not sell any of our purchased uranium during Fiscal 2024. We have yet to achieve consistent profitability or develop consistent positive cash flow from operations. Our reliance on equity and debt financings is expected to continue for the foreseeable future, and their availability whenever such additional financing is required will be dependent on many factors beyond our control including, but not limited to, the market price of uranium, the continuing public support of nuclear power as a viable source of electricity generation, the volatility in the global financial markets affecting our stock price and the status of the worldwide economy, any one of which may cause significant challenges in our ability to access additional financing, including access to the equity and credit markets. We may also be required to seek other forms of financing, such as asset divestitures or additional joint venture arrangements, to continue advancing our uranium projects which would depend entirely on finding a suitable third party willing to enter into such an arrangement, typically involving an assignment of a percentage interest in the mineral project. However, there is no assurance that we will be successful in securing any form of additional financing when required and on terms favorable to us. Our inability to obtain additional financing would have a negative impact on our operations, including delays, curtailment or abandonment of any one or all of our uranium projects.
We have not established proven or probable reserves through the completion of a final or bankable feasibility study for any of the mineral projects we operate. We have established the existence of mineralized materials for certain uranium projects, including our ISR Mines. Since we commenced uranium extraction at our ISR Mines without having established proven or probable reserves, there may be greater inherent uncertainty as to whether or not any mineralized material can be economically extracted as originally planned and anticipated.
The economic viability of our mining activities, including the expected duration and profitability of our ISR Mines, of any future satellite ISR mines, such as our Burke Hollow, Goliad, Ludeman, Antelope and Charlie Projects, and of our recently acquired traditional uranium mines in Athabasca Basin, in Saskatchewan, Canada, has many risks and uncertainties. These include, but are not limited to: (i) a significant, prolonged decrease in the market price of uranium; (ii) difficulty in marketing and/or selling uranium concentrates; (iii) significantly higher than expected capital costs to construct a mine and/or processing plant; (iv) significantly higher than expected extraction costs; (v) significantly lower than expected uranium extraction; (vi) significant delays, reductions or stoppages of uranium extraction activities; and (vii) the introduction of significantly more stringent regulatory laws and regulations. Our mining activities may change as a result of any one or more of these risks and uncertainties and there is no assurance that any ore body that we extract mineralized materials from will result in achieving and maintaining profitability and developing positive cash flow.
As at July 31, 2024, we had no uranium supply or off-take agreements in place. Future sales of U3O8 are therefore expected to generally occur through the uranium spot market, with any fluctuations in the market price continuing to have a direct impact on our revenues and cash flows.
105
Table of Contents
The table below provides the high/low/average/close for the uranium spot price for each of our last five fiscal years as obtained from UxC:
| Fiscal Year Ended | High | Low | Average | Close | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| July 31, 2024 | $ | 107.00 | $ | 56.50 | $ | 83.06 | $ | 85.50 | |||||||
| July 31, 2023 | 57.75 | 47.75 | 51.27 | 56.25 | |||||||||||
| July 31, 2022 | 63.75 | 30.50 | 46.56 | 48.50 | |||||||||||
| July 31, 2021 | 32.75 | 27.31 | 30.38 | 32.40 | |||||||||||
| July 31, 2020 | 34.19 | 23.88 | 27.66 | 32.35 |
Historically, the uranium spot price has been difficult to predict and subject to significant volatility and will continue to be affected by numerous factors beyond our control.
Results of Operations
During Fiscal 2024, we recorded sales and service revenue of $224 and realized gross profit of $37. For Fiscal 2023, we recorded sales and service revenue of $164,389 and realized gross profit of $49,670. For Fiscal 2022, we recorded sales and service revenue of $23,161 and realized gross profit of $7,293.
We recorded a net loss of $29,221 ($0.07 per share) for Fiscal 2024 and $3,307 ($0.01 per share) for Fiscal 2023, respectively, while we recorded a net income of $5,252 ($0.02 per share) for Fiscal 2022. Income (loss) from operations during Fiscal 2024, Fiscal 2023 and Fiscal 2022 was $(56,402), $8,867 and $(22,710), respectively.
While we remain in a state of operational readiness, uranium extraction expenditures incurred at our ISR Mines, which are directly related to regulatory/mine permit compliance, lease maintenance obligations and maintaining a necessary labor force, are being charged to our consolidated statement of operations.
We established our physical uranium program to purchase drummed uranium at prevailing spot prices which are below most global industry mining costs in Fiscal 2021. As of July 31, 2024, we have 700,000 pounds of uranium inventory purchase commitments outstanding for a total purchase price of $26,740. Various deliveries are scheduled to occur from Fiscal 2025 into Fiscal 2026 at a weighted average price of $38.20 per pound of uranium.
During Fiscal 2024, as part of our Physical Uranium Program, we purchased 1,295,000 pounds of uranium concentrates with a total cost of $69.6 million. As of July 31, 2024, the carrying value of our uranium inventories was $75,440 (July 31, 2023: $5,801).
Sales and Service Revenue
During Fiscal 2024, we recorded sales of $Nil from the sale of uranium concentrate inventory, which decreased by $163,950 and $22,946 compared to Fiscal 2023 and Fiscal 2022, respectively. In addition, we recorded revenue from toll processing services of $224 in Fiscal 2024, which was generated from processing uranium resins according to a toll processing agreement resulting from the U1A Acquisition, compared to $439 in Fiscal 2023 and $215 in Fiscal 2022. As a result, we realized gross profit of $37, representing a gross profit margin of 16.5% in Fiscal 2024, compared to $49,670 in Fiscal 2023 and $7,293 in Fiscal 2022.
The table below provides a breakdown of sales and service revenue and cost of sales and services:
| Year Ended July 31, | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2024 | 2023 | 2022 | ||||||||||
| Sales of purchased uranium inventory | $ | - | $ | 163,950 | $ | 22,946 | ||||||
| Revenue from toll processing services | 224 | 439 | 215 | |||||||||
| Total sales and service revenue | $ | 224 | $ | 164,389 | $ | 23,161 | ||||||
| Cost of purchased uranium inventory | $ | - | $ | (114,353 | ) | $ | (15,689 | ) | ||||
| Cost of toll processing services | (187 | ) | (366 | ) | (179 | ) | ||||||
| Total cost of sales and services | $ | (187 | ) | $ | (114,719 | ) | $ | (15,868 | ) |
Operating Costs
Mineral Property Expenditures
Mineral property expenditures consisted of expenditures relating to permitting, property maintenance, exploration and pre-extraction activities and all other non-extraction related activities on our mineral projects.
The following table provides the nature of mineral property expenditures during the past three fiscal years:
| Year Ended July 31, | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 2024 | 2023 | 2022 | |||||||||
| Permitting and compliance | $ | 1,895 | $ | 396 | $ | 676 | |||||
| Property maintenance | 3,986 | 3,608 | 2,635 | ||||||||
| Exploration | 14,669 | 9,308 | 2,582 | ||||||||
| Development | 6,650 | 1,749 | 1,995 | ||||||||
| Production readiness | 5,183 | 3,559 | 2,266 | ||||||||
| Total | $ | 32,383 | $ | 18,620 | $ | 10,154 |
106
Table of Contents
During Fiscal 2024, the exploration expenditures, such as drilling and preliminary economic assessments, were primarily spent on the following projects:
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | Roughrider Project: $6,317 (Fiscal 2023: $1,287, Fiscal 2022: $nil); |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | Buke Hollow Project: $5,230 (Fiscal 2023: $3,107, Fiscal 2022: $1,105); and |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | Christensen Ranch Mine: $1,060 (Fiscal 2023: $470, Fiscal 2022: $nil). |
During Fiscal 2024, the production readiness expenditures were primarily spent on the following projects:
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | Palangana Mine: $1,269 (Fiscal 2023: $905, Fiscal 2022: $505); and |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | Christensen Ranch Mine: $2,900 (Fiscal 2023: $1,799, Fiscal 2022: $225). |
During Fiscal 2024, the property maintenance expenditures were primarily spent on the following projects:
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | Buke Hollow Project: $681 (Fiscal 2023: $703, Fiscal 2022: $313); |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | Reno Creek Project: $585 (Fiscal 2023: $391, Fiscal 2022: $409); |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | Christensen Ranch Mine: $364 (Fiscal 2023: $323, Fiscal 2022: $109); |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | Ludeman Project: $353 (Fiscal 2023: $328, Fiscal 2022: $122); and |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | Allemand Ross Project: $405 (Fiscal 2023: $372, Fiscal 2022: $139). |
General and Administrative
During Fiscal 2024, general and administrative (“G&A”) expenses totaled $21,873, compared to $20,064 in Fiscal 2023 and $15,026 in Fiscal 2022. G&A expenses were comprised of the following:
| Year Ended July 31, | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 2024 | 2023 | 2022 | |||||||||
| Salaries and management fees | $ | 7,705 | $ | 5,168 | $ | 4,281 | |||||
| Office, investor relations, communication, insurance and travel | 5,807 | 6,801 | 4,501 | ||||||||
| Foreign exchange (gain) loss | (151 | ) | 71 | 317 | |||||||
| Professional fees | 3,340 | 2,609 | 1,387 | ||||||||
| Sub-total | 16,701 | 14,649 | 10,486 | ||||||||
| Stock-based compensation | 5,172 | 5,415 | 4,540 | ||||||||
| Total general and administrative expenses | $ | 21,873 | $ | 20,064 | $ | 15,026 |
The following summary provides a discussion of the major expense categories, including analyses of factors that caused significant variances from year-to-year:
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | during Fiscal 2024, salaries and management fees totaled $7,705, compared to $5,168 in Fiscal 2023, which was primarily the result of hiring additional general and administrative personnel to support the Company's expansion and a corporate-wide salary increase. During Fiscal 2023, salaries, wages and management fees totaled $5,168, compared to $4,281 during Fiscal 2022. The increase in salaries and managements fee in Fiscal 2023 from Fiscal 2022 was primarily due to the corporate-wide salary increase and the acquisition of UEX. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | during Fiscal 2024, office, investor relations, communications, insurance and travel expenses totaled $5,807, compared to $6,801 during Fiscal 2023, which was primarily the result of decreases in corporate development, investor relations and travel expenses. During Fiscal 2023, office, filing and listing fees, insurance, corporate development, investor relations and travel expenses totaled $6,801, compared to $4,501 during Fiscal 2022, which was primarily the result of increases in expenses due to the inclusion of our Wyoming and Canadian projects. |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | during Fiscal 2024, professional fees totaled $3,340, compared to $2,609 in Fiscal 2023. During Fiscal 2023, professional fees totaled $2,609, compared to $1,387 in Fiscal 2022. Professional fees are comprised primarily of legal services related to transactional activities, regulatory compliance and for audit, accounting and tax compliance services. The overall increasing trend in professional fees is due to the growth in our business activities and the expansion of our operations; and |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | During Fiscal 2024 stock-based compensation expense totaled $5,172, compared to $5,415 during Fiscal 2023 and $4,540 during Fiscal 2022. Stock-based compensation includes the amortization of fair value of stock options granted to optionees and the fair value of shares of the Company issued to directors, officers, employees and consultants of the Company under our Stock Incentive Plan. The stock-based compensation varies from year to year primarily as a result of changes in the amount of compensation shares and stock award expenses which were amortized on an accelerating basis, resulting in more expenses being recorded at the beginning of the vesting period than at the end. |
Acquisition-related Costs
During Fiscal 2023, the acquisition-related costs of UEX and the Roughrider Project were capitalized in our consolidated balance sheets as both the UEX and Roughrider Project acquisitions were accounted for as asset acquisitions under US GAAP. During Fiscal 2022, we incurred acquisition-related costs of $3,444 in our statement of operations in connection with the U1A Acquisition, as it was accounted for as a business combination.
Depreciation, Amortization and Accretion
During Fiscal 2024, depreciation, amortization and accretion totaled $2,183, which increased by $176 compared to $2,007 during Fiscal 2023. During Fiscal 2023, depreciation, amortization and accretion totaled $2,007, which increased by $628 compared to $1,379 during Fiscal 2022, primarily due to a full-year depreciation of our plant and equipment acquired from the U1A Acquisition compared to seven months of depreciation in Fiscal 2022. Depreciation, amortization and accretion includes depreciation and amortization of long-term assets acquired in the normal course of operations and accretion of asset retirement obligations.
107
Table of Contents
Other Income and Expenses
Interest and Finance Costs
Interest and finance costs were comprised of the following:
| Year Ended July 31, | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 2024 | 2023 | 2022 | |||||||||
| Interest paid on long-term debt | $ | - | $ | - | $ | 409 | |||||
| Amortization of debt discount | - | - | 525 | ||||||||
| Surety bond premium | 772 | 760 | 539 | ||||||||
| Other | 55 | 45 | 46 | ||||||||
| Total | $ | 827 | $ | 805 | $ | 1,519 |
During Fiscal 2024, surety bond premium was $772 compared to $760 during Fiscal 2023 and $539 during Fiscal 2022. The surety bond premiums resulted from the surety bonds assumed as a result of the U1A Acquisition. During Fiscal 2023, the decrease in interest on long-term debt and amortization of debt discount resulted from the decrease in the outstanding principal amount of our long-term debt to $Nil as at January 31, 2022.
Income from Equity-Accounted Investment
During Fiscal 2024, Fiscal 2023 and Fiscal 2022, income from the equity-accounted investment comprised of the following:
| Year Ended July 31, | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 2024 | 2023 | 2022 | |||||||||
| Share of income (loss) | $ | 592 | $ | (1,648 | ) | $ | 153 | ||||
| Gain on dilution of ownership interest | 425 | 654 | 3,973 | ||||||||
| Total | $ | 1,017 | $ | (994 | ) | $ | 4,126 |
During Fiscal 2024, Fiscal 2023 and Fiscal 2022, we recorded a gain on dilution of ownership interest in Uranium Royalty Corp. (“URC”) of $425, $654 and $3,973, respectively, as a result of URC issuing more shares from its equity financings, which decreased our ownership interest in URC to 14.8% at July 31, 2024, from 14.9% at July 31, 2023 and from 15.5% at July 31, 2022.
During Fiscal 2024, Fiscal 2023 and Fiscal 2022, we recorded a share of URC’s income of $2,032, $414 and $153, respectively. During Fiscal 2024 and Fiscal 2023, we also recorded a share of JCU’s loss of $1,440 and $2,062, respectively, since the acquisition of UEX which owns 50% of JCU.
Debt Receivable Recovery and Gain on Settlement of Debt Receivable
In connection with the U1A Acquisition, we acquired certain indebtedness totaling $18,342 due from Anfield, which was owed to U1A prior to the closing of the U1A Acquisition (the “Anfield Debt”). We assigned a value of $Nil to the Anfield Debt net of the expected credit loss on the preliminary purchase price allocation given that the probability of the Anfield Debt being collectable was remote at December 17, 2021.
On April 19, 2022, we entered into a debt settlement agreement (the “Settlement Agreement”) and a property swap agreement (the “Swap Agreement”; and together with the Settlement Agreement, the “Anfield Agreements”) with Anfield to settle the Anfield Debt. Pursuant to the Anfield Agreements, the Anfield Debt was settled by the payment by Anfield to UEC of $9,171 in cash and the issuance by Anfield to UEC in units of Anfield (each, an “Anfield Unit”) with a deemed value of $9,171, with each such Anfield Unit being comprised of one common share in the capital of Anfield (each, an “Anfield Common Share”) and one Anfield Common Share purchase warrant (each whole such warrant being an “Anfield Warrant”). Each Anfield Warrant entitles UEC to acquire one Anfield Common Share at a price of CA$0.18 until May 12, 2027 (collectively, the “Anfield Debt Settlement”). Completion of the Anfield Agreements was contingent on Anfield raising additional financing.
On June 7, 2022, we closed the Anfield Debt Settlement whereby we received $9,171 in cash and the Anfield Units, being comprised of 96,272,918 Anfield Common Shares with a fair value of $7,702 and 96,272,918 Anfield Warrants with a fair value of $3,249.
Consequently, we reversed the entire expected credit loss on the debt receivable and recognized a recovery on debt receivable of $18,342 on our consolidated statements of operations and comprehensive income in Fiscal 2022. The fair value of the cash and the Anfield Units totaled $20,122, which exceeded the amounts of $18,342 previously written off at the date of U1A Acquisition by $1,780, resulting in a gain on settlement of the Anfield Debt receivable on our consolidated statements of operations and comprehensive income.
Gain on Disposition of Assets
Consequently, we reversed the entire expected credit loss on the debt receivable and recognized a recovery on debt receivable of $18,342 on our consolidated statements of operations and comprehensive income in Fiscal 2022. The fair value of the cash and the Anfield Common Shares and Anfield Warrants totaled $20,122, which exceeded the amounts of $18,342 previously written off at the date of U1A Acquisition by $1,780, resulting in a gain on settlement of the Anfield Debt receivable on our consolidated statements of operations and comprehensive income.
Fair value gain (loss) on Equity Securities
As at July 31, 2024, our investments in certain equity securities are re-evaluated using the market values at period end, which resulted in fair value gain totaling $27,506 compared to fair value losses of $13,083 in Fiscal 2023 and $1,351 in Fiscal 2022. Refer to Note 19: Fair Value Gain (Loss) on Equity Securities of the Consolidated Financial Statements for the year ended July 31, 2024 contained herein.
108
Table of Contents
Liquidity and Capital Resources
| July 31, 2024 | July 31, 2023 | ||||||
|---|---|---|---|---|---|---|---|
| Cash and cash equivalents | $ | 87,533 | $ | 45,614 | |||
| Current assets | 235,244 | 55,205 | |||||
| Current liabilities | 29,222 | 12,194 | |||||
| Working capital | 206,022 | 43,011 |
During Fiscal 2024, we received net proceeds of $176,708 from equity financing and from exercises of stock options and share purchase warrants. As at July 31, 2024, we had a working capital of $206,022. The increase in accounts payable and accrued liabilities from July 31, 2023 to July 31, 2024 is primarily attributable to the purchase of uranium inventory amounting to $8.9 million at the end of Fiscal 2024, which had no impact on the working capital as at July 31, 2024.
We have a history of operating losses resulting in an accumulated deficit balance since inception. Although we recorded net income in Fiscal 2022, we recorded net losses in Fiscal 2024 and all prior years, and we had an accumulated deficit balance of $318,901 as at July 31, 2024. During Fiscal 2024, net cash used in operating activities totaled $106,487. Furthermore, we may not achieve and maintain profitability or develop positive cash flow from our operations in the near term.
Historically, we have been reliant primarily on equity financings from the sale of our common stock and on debt financing in order to fund our operations. We have yet to achieve consistent profitability or develop consistent positive cash flow from operations. In recent years, we also rely on cash flows generated from the sales of our purchased uranium concentrates to fund our operations. Our reliance on equity and debt financings is expected to continue for the foreseeable future, and their availability whenever such additional financing is required will be dependent on many factors beyond our control and including, but not limited to, the market price of uranium, the continuing public support of nuclear power as a viable source of electricity generation, the volatility in the global financial markets affecting our stock price and the status of the worldwide economy, any one of which may cause significant challenges in our ability to access additional financing, including access to the equity and credit markets. We may also be required to seek other forms of financing, such as asset divestitures or joint venture arrangements, to continue advancing our uranium projects which would depend entirely on finding a suitable third party willing to enter into such an arrangement, typically involving an assignment of a percentage interest in the mineral project. However, there is no assurance that we will be successful in securing any form of additional financing when required and on terms favorable to us.
Our operations are capital intensive and future capital expenditures are expected to be substantial. We will require significant additional financing to fund our operations, including continuing with our exploration and pre-extraction activities and acquiring additional uranium projects. In the absence of such additional financing, we would not be able to fund our operations, including continuing with our exploration and pre-extraction activities, which may result in delays, curtailment or abandonment of any one or all of our uranium projects.
We hold mineral rights in the States of Arizona, New Mexico, Texas and Wyoming, in Canada and in the Republic of Paraguay, with annual land-related payments totaling $3.8 million to maintain these rights in good standing.
Our anticipated operations, including exploration and pre-extraction activities, however, will be dependent on and may change as a result of our financial position, the market price of uranium and other considerations, and such change may include accelerating the pace or broadening the scope of reducing our operations. Our ability to secure adequate funding for these activities will be impacted by our operating performance, other uses of cash, the market price of uranium, the market price of our common stock and other factors which may be beyond our control. Specific examples of such factors include, but are not limited to:
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | if the market price of uranium weakens; |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | if the market price of our common stock weakens; and |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | if a nuclear incident, such as the event that occurred in Japan in March 2011, were to occur, continuing public support of nuclear power as a viable source of electricity generation may be adversely affected, which may result in significant and adverse effects on both the nuclear and uranium industries. |
We believe our existing cash resources and, if necessary, cash generated from the sale of the Company’s liquid assets, will provide sufficient funds to carry out our planned operations for 12 months from the date that this Annual Report is issued. Our continuation as a going concern for a period beyond those 12 months will be dependent upon our ability to generate cash flow from the sales of our uranium inventories under our Physical Uranium Program and to obtain adequate additional financing, as our operations are capital intensive and future capital expenditures are expected to be substantial.
Our long-term success, including the recoverability of the carrying values of our assets and our ability to acquire additional uranium projects and continue with exploration and pre-extraction activities and mining activities on our existing uranium projects, will depend ultimately on our ability to achieve and maintain profitability and positive cash flow from our operations by establishing ore bodies that contain commercially recoverable uranium and to develop these into profitable mining activities.
Equity Financings
On May 17, 2021, we filed a Form S-3 shelf registration statement under the Securities Act which was declared effective by the SEC on June 1, 2021, providing for the public offer and sale of certain securities of the Company from time to time, at our discretion, of up to an aggregate offering amount of $200 million (the “2021 Shelf”), which included an at-the-market offering agreement prospectus (the “May 2021 ATM Offering”) covering the offering, issuance and sale of up to a maximum offering of $100 million as part of the $200 million under the 2021 Shelf.
On May 14, 2021, we entered into an at-the-market offering agreement (the “2021 ATM Offering Agreement”) with H.C. Wainwright & Co., LLC and certain co-managers (collectively, the “ATM Managers”) as set forth in the 2021 ATM Offering Agreement under which we may, from time to time, sell shares of our common stock having an aggregate offering price of up to $100 million through the ATM Managers selected by us.
On November 26, 2021, we filed a prospectus supplement to our 2021 Shelf with respect to the continuation of the May 2021 ATM Offering Agreement with the ATM Managers under which we may, if eligible, from time to time, sell shares of our common stock having an aggregate offering price of up to an additional $100 million for a total of $200 million through the ATM Managers selected by us (the “November 2021 ATM Offering”; and, collectively with the May 2021 ATM Offering, the “2021 ATM Offering”).
On November 16, 2022, we filed a Form S-3 automatic shelf registration statement under the Securities Act, which became effective upon filing, providing for the public offer and sale of certain securities of the Company from time to time, at our discretion, of an undetermined dollar value of common stock, debt securities, warrants to purchase common stock or debt securities, subscription receipts for and units which include common stock, debt securities, warrants or any combination thereof (the “2022 Shelf”), which included an at-the-market offering agreement prospectus (the “2022 ATM Offering”; and, collectively, with the 2021 ATM Offering, the “ATM Offerings”) covering the offering, issuance and sale of up to a maximum offering of $300 million under the 2022 Shelf.
109
Table of Contents
On November 16, 2022, we entered into an at-the-market offering agreement (the “2022 ATM Offering Agreement”) with the ATM Managers as set forth in the 2022 ATM Offering Agreement under which we may, from time to time, sell shares of our common stock having an aggregate offering price of up to $300 million through the ATM Managers selected by us.
During Fiscal 2022, we issued 47,507,536 shares of the Company’s common stock under our ATM Offerings for gross cash proceeds of $167,588. The total issuance costs were $3,833, which includes compensation of $3,774 paid to the ATM Managers.
During Fiscal 2023, we issued 15,171,253 shares of the Company’s common stock under our ATM Offerings for gross cash proceeds of $59,816. The total issuance costs were $1,396, which includes compensation of $1,346 paid to the ATM Managers.
During Fiscal 2024, we issued 26,375,699 shares of the Company’s common stock under our ATM Offerings for gross cash proceeds of $171,738. The total issuance costs were $3,864, all of which were related to compensation paid to the ATM Managers.
Credit Facility
On December 5, 2018, we entered into the Third Amended and Restated Credit Agreement to our credit facility (the “Credit Facility”) with our lenders (each, a “Lender”), whereby we and the Lenders agreed to certain further amendments to our Credit Facility, under which initial funding of $10,000 was received by the Company upon closing of the Credit Facility on July 30, 2013, and additional funding of $10,000 was received by the Company upon closing of the amended Credit Facility on March 13, 2014.
The Third Credit Amended and Restated Agreement superseded, in their entirety, the Company’s prior Second Amended and Restated Credit Agreement, dated and effective February 9, 2016, the Amended and Restated Credit Agreement, dated and effective March 13, 2014, and the Credit Agreement dated and effective July 30, 2013, with our Lenders.
Pursuant to the terms of the Third Amended and Restated Credit Agreement, during Fiscal 2022, we issued 161,594 shares with a fair value of $600.
During Fiscal 2022, we made payment of $10,000 to the remaining Lender, which decreased the principal balance outstanding to $Nil, and the Credit Facility was terminated as at July 31, 2022.
Operating Activities
During Fiscal 2024, we recorded net cash used in operating activities of $106,487. The negative cash flow was primarily driven by the purchase of uranium concentrates of $69,626 and operating expenditures such as mineral property expenditures and G&A expenses. During Fiscal 2023, we recorded net cash provided by operating activities of $72,573. The positive cash flow was primarily driven by the gross profit of $49,670, a decrease in our inventory balance of $60,363 and was partially offset by operating expenditures such as mineral property expenditures and G&A expenses. During Fiscal 2022, net cash used in operating activities totaled $52,987, of which $37,206 was for purchases of uranium concentrates.
Financing Activities
During Fiscal 2024, net cash provided from financing activities totaled $173,076, primarily from net cash of $176,708 from our ATM Offerings and the exercises of stock options and share purchase warrants, offset by payments of $3,632 for tax withholding amounts related to the issuance of options, RSU and PRSU shares.
During Fiscal 2023, net cash provided from financing activities totaled $65,417, primarily from net cash of $66,527 from our ATM Offerings and the exercises of stock options and share purchase warrants, offset by payments of $1,044 for tax withholding amounts related to the issuance of RSU and PRSU shares.
During Fiscal 2022, net cash provided from financing activities totaled $157,266, primarily from net cash of $163,755 from the 2021 ATM Offerings and $4,259 from the exercises of stock options and share purchase warrants, offset by the payments of $557 for tax withholding amounts related to the issuance of RSU and PRSU shares, the principal payment of $10,000 to our remaining lender under our then Credit Facility and $191 for a promissory note.
Investing Activities
During Fiscal 2024, net cash used for investing activities totaled $24,641, comprised of cash used for investment in equity securities of $12,115, the purchase of an additional interest in URC of $9,238, capital contributions to JCU of $2,876, cash used for investment in mineral rights and properties of $1,441 and cash used for the purchase of property, plant and equipment of $1,987, offset by cash proceeds of $3,008 from the sale of equity securities and $8 from the disposition of assets.
During Fiscal 2023, net cash used for investing activities totaled $124,780, comprised of net cash used for the acquisition of the Roughrider Project of $82,117, cash used for investment in equity securities of $47,192, capital contributions to JCU of $1,415, cash used for investment in mineral rights and properties of $101 and cash used for the purchase of property, plant and equipment of $555, offset by cash received as a result of the acquisition of UEX of $1,984 and $26 from the disposition of assets.
During Fiscal 2022, net cash used for investing activities totaled $110,843, comprised of net cash used in the U1A Acquisition of $113,588, cash used in investment in equity securities of $15,215, cash used for investment in mineral rights and properties of $590 and cash used for the purchase of property, plant and equipment of $620, offset by cash proceeds of $9,980 from sales of equity securities, $9,171 from recovery of the Anfield Debt receivable and $19 from the disposition of assets.
Stock Options and Warrants
As at July 31, 2024, the Company had 5,103,339 stock options outstanding at a weighted-average exercise price of 2.66 per share, and 1,265,319 share purchase warrants outstanding at a weighted-average exercise price of $3.42 per share. As at July 31, 2024, the Company had 5,053,196 in-the-money stock options outstanding at a weighted-average exercise price of $2.62 per share and 1,265,319 in-the-money share purchase warrants outstanding at a weighted-average exercise price of $3.42 per share. As at July 31, 2024, outstanding in-the-money stock options and share purchase warrants represented a total of 6,318,515 shares issuable for gross proceeds of approximately $17.6 million should the stock options and the share purchase warrants be exercised in full. The exercise of these stock options and share purchase warrants is at the discretion of their respective holders and, accordingly, there is no assurance that any of these stock options or share purchase warrants will be exercised in the future.
110
Table of Contents
Plan of Operations
We restarted extracting uranium at Christensen Ranch Mine in August 2024 and expect first shipment of yellowcake in November or December 2024. We will hire additional personnel for future wellfield development and expand extraction at the Christensen Ranch Mine in Fiscal 2025. Our Palangana Mine is expected to continue being operated at a reduced pace, including the deferral of major pre-extraction expenditures, and to remain in a state of operational readiness. In addition, we will continue the drilling program at our Burke Hollow and Roughrider Projects, as well as carry out additional exploration activities as required on our remaining project portfolio.
Material Contractual Obligations and Commitments
As at July 31, 2024, significant payment obligations of the Company over the next five years and beyond are as follows:
| Payment Due by Period | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Contractual Obligations | Total | Less Than 1 Year | 1-3 Years | 3-5 Years | More Than 5 Years | ||||||||||||||
| Asset Retirement Obligations | $ | 29,029 | $ | 2,953 | $ | 4,998 | $ | 4,308 | $ | 16,770 | |||||||||
| Operating Lease Obligations | 2,600 | 424 | 772 | 520 | 884 | ||||||||||||||
| Uranium Inventory Purchase Obligations | 26,740 | 23,120 | 3,620 | - | - | ||||||||||||||
| Total | $ | 58,369 | $ | 26,497 | $ | 9,390 | $ | 4,828 | $ | 17,654 |
As at July 31, 2024, we were renting or leasing office premises in Texas, Arizona and Wyoming, U.S., Vancouver, British Columbia, Canada, and Paraguay for total monthly payments of $44. Office lease agreements for the U.S. and Canada expire between July 2026 and November 2029.
Off-Balance Sheet Arrangements
We do not have any off-balance sheet arrangements that have or are reasonably likely to have a current or future material effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources.
Critical Accounting Policies
For a complete summary of all of our significant accounting policies, refer to Note 2: Summary of Significant Accounting Policies of the Notes to the Consolidated Financial Statements as presented under Item 8. Financial Statements and Supplementary Data herein.
The preparation of financial statements in conformity with U.S. GAAP requires management to make judgements, estimates and assumptions that affect the reported amount of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported revenues and expenses during the reported periods. Areas requiring significant judgements, estimates and assumptions include the valuation of acquired mineral rights and properties, existence of impairment indicators for the Company’s long-lived assets, valuation and measurement of impairment losses on mineral rights and properties, valuation of recoverability of a credit loss, valuation of stock-based compensation and valuation of asset retirement obligations. Other areas requiring estimates include allocations of expenditures to inventories, depletion and amortization of mineral rights and properties and depreciation of property, plant and equipment. Actual results could differ significantly from those estimates and assumptions. The following summary provides a description of our critical accounting policies.
Mineral Rights and Exploration Stage
Acquisition costs of mineral rights are initially capitalized as incurred while exploration and pre-extraction expenditures are expensed as incurred until such time proven or probable reserves are established for that project.
We have established the existence of mineralized materials for certain uranium projects, including our ISR Mines. However, we have not established proven or probable reserves for any of the uranium projects we operate, including our ISR Mines. Furthermore, we currently have no plans to establish proven or probable reserves for any of our uranium projects for which we plan on utilizing ISR mining. As a result, and despite the fact that we commenced extraction of mineralized materials at our ISR Mines, we remain in the Exploration Stage and will continue to remain in the Exploration Stage until such time proven or probable reserves have been established.
Companies in the Production Stage that have established proven and probable reserves and exited the Exploration Stage, typically capitalize expenditures relating to ongoing development activities, with corresponding depletion calculated over proven and probable reserves using the units-of-production method and allocated to future reporting periods to inventory and, as that inventory is sold, to cost of goods sold. Since we are in the Exploration Stage, it has resulted in our reporting of lower income or larger losses than if we had been in the Production Stage due to the expensing, instead of capitalization, of expenditures relating to ongoing mine development activities. Additionally, there would be no corresponding amortization allocated to our future reporting periods since those costs would have been expensed previously, resulting in both lower inventory costs and cost of goods sold and results of operations with higher gross profits and lower losses than if we had been in the Production Stage. Any capitalized costs, such as expenditures relating to the acquisition of mineral rights, are depleted over the estimated extraction life using the straight-line method. As a result, our consolidated financial statements may not be directly comparable to the financial statements of companies in the Production Stage.
111
Table of Contents
Business Combination and Asset Acquisition
When an acquisition does not meet the definition of a business combination, as the acquired entity does not have an input and a substantive process that together significantly contribute to the ability to create outputs, we account for the acquisition as an asset acquisition. In an asset acquisition, any direct acquisition-related transaction costs are capitalized as part of the purchase consideration. Deferred taxes are recorded on temporary book/tax differences in an asset acquisition using the simultaneous equations method and adjusted the assigned value of the non-monetary assets acquired to include the deferred tax liability.
When an acquisition is accounted for as a business combination, we recognize and measure the assets acquired and liabilities assumed based on their estimated fair values at the acquisition date, while transaction costs related to business combinations are expensed as incurred. An income, market or cost valuation method may be utilized to estimate the fair value of the assets acquired and liabilities assumed, if any, in a business combination. The income valuation method represents the present value of future cash flows over the life of the asset using: (i) discrete financial forecasts, which rely on management’s estimates of resource quantities and exploration potential, costs to produce and develop resources, revenues and operating expenses; (ii) appropriate discount rates; and (iii) expected future capital requirements (the “income valuation method”). The market valuation method uses prices paid for a similar asset by other purchasers in the market, normalized for any differences between the assets (the “market valuation method”). The cost valuation method is based on the replacement cost of a comparable asset at the time of the acquisition adjusted for depreciation and economic and functional obsolescence of the asset (the “cost valuation method”). If the initial accounting for the business combination is incomplete by the end of the reporting period in which the acquisition occurs, an estimate will be recorded. Subsequent to the acquisition date, and not later than one year from the acquisition date, we will record any material adjustments to the initial estimate based on new information obtained that would have existed as of the date of the acquisition. Any adjustment that arises from information obtained that did not exist as of the date of the acquisition will be recorded in the period the adjustments arises.
Equity Investments
Investments in an entity in which our ownership is greater than 20% but less than 50%, a 50/50 joint venture which the Company does not have control, or an entity where other facts and circumstances indicate that we have the ability to exercise significant influence over its operating and financing policies, are accounted for using the equity method in accordance with ASC 323: Investments – Equity Method and Joint Ventures. Equity-accounted investments are recorded initially at cost and adjusted subsequently to recognize our share of the earnings, losses or other changes in capital of the investee entity after the date of acquisition. We periodically evaluate whether declines in fair values of our equity investments below the carrying value are other-than-temporary and, if so, whether an impairment loss is required.
Additionally, we hold certain equity investments in entities that we do not have the ability to exercise significant influence. These equity investments represent our ownership interests in certain entities, and therefore meet the definition of an equity security under ASC 321 Investments – Equity Securities and are measured at fair value at each period end, with unrealized holding gains or losses recorded to earnings.
Impairment of Long-lived Assets
Long-lived assets including mineral rights and property, plant and equipment are reviewed for impairment whenever events or changes in circumstances indicate the carrying amount of an asset or asset group may not be recoverable. Management applies judgment to assess whenever events or changes in circumstances indicate the carrying amount of an asset or asset group may not be recoverable giving rise to the requirement to conduct an impairment test. Circumstances which could trigger an impairment test include, but are not limited to: (i) significant decreases in the market price of the asset; (ii) significant adverse changes in the business climate or legal factors including significant decreases in uranium prices and material adverse changes relating to the Company’s legal rights to its mineral rights and properties; (iii) significant increase in reclamation costs and accumulation of costs significantly in excess of the amount originally expected for the acquisition or construction of the asset; (iv) current period cash flow or operating losses combined with a history of losses or a forecast of continuing losses associated with the use of the asset; and (v) current expectation that the asset will more likely than not be sold or disposed of significantly before the end of its estimated useful life. Recoverability of these assets is measured by comparing the carrying value to the future undiscounted cash flows expected to be generated by the assets. When the carrying value of an asset exceeds the related undiscounted cash flows, an impairment loss is recorded by writing down the carrying value of the related asset to its estimated fair value, which is determined using discounted future cash flows or other measures of fair value.
Restoration and Remediation Costs (Asset Retirement Obligations)
Various federal and state mining laws and regulations require our Company to reclaim the surface areas and restore underground water quality to the pre-existing quality or class of use after the completion of mining. We recognize the present value of the future restoration and remediation costs as an asset retirement obligation (each, an “ARO”) in the period in which we incur an obligation associated with the retirement of tangible long-lived assets that result from the acquisition, construction, development and/or normal use of the assets.
AROs consist of estimated final well closure, plant and equipment decommissioning and removal and environmental remediation costs to be incurred by our Company in the future. The AROs are estimated based on the current costs escalated at an inflation rate and discounted at a credit adjusted risk-free rate. The AROs are capitalized as part of the costs of the underlying assets and amortized over its remaining useful life. The AROs are accreted to an undiscounted value until they are settled. The accretion expenses are charged to earnings and the actual retirement costs are recorded against the AROs when incurred. Any difference between the recorded AROs and the actual retirement costs incurred will be recorded as a gain or loss in the period of settlement.
Stock-based Compensation
We measure stock-based awards at fair value on the date of the grant and expense the awards in our Consolidated Statements of Operations and Comprehensive Loss over the requisite service period of employees or consultants. The fair value of stock options is determined using the Black-Scholes Valuation Model. The fair value of RSUs is determined using the share price of the Company at the date of grant. The fair value of PRSUs is determined using a Monte Carlo Simulation Model. Stock-based compensation expense related to stock awards is recognized over the requisite service period on a graded vesting basis. Forfeitures are accounted for as they occur.
112
Table of Contents
Subsequent Events
Acquisition of Wyoming project
On September 20, 2024, the Company, through its wholly-owned subsidiary, UEC Sweetwater Corp., a Delaware corporation (the “Buyer”) entered into a stock purchase agreement (the “Stock Purchase Agreement”) with Rio Tinto America Inc., a Delaware corporation (the “Seller”), pursuant to which the Company through the Buyer will acquire from the Seller all of the issued and outstanding shares of capital stock (the “Shares”) of (i) Kennecott Uranium Company, a Delaware corporation (“KUC”), which is a joint venture participant of, and owns a 50% ownership interest in, the Green Mountain Mining Venture, an unincorporated Wyoming contractual joint venture (“GMMV”), and (ii) Wyoming Coal Resources Company, a Delaware corporation (“WCRC”), which is a joint participant of, and owns a 50% ownership interest in GMMV (collectively, the “Acquisition”). KUC, WCRC and GMMV, collectively, own or hold the assets, rights and obligations comprised of: (i) the facilities, equipment, improvements and fixtures for the processing of uranium located in Sweetwater County, Wyoming owned by KUC, WCRC and GMMV, and related facilities and impoundments; (ii) the Jackpot and Big Eagle properties located in Wyoming; (iii) the mineral and real property interests which are owned or leased by KUC, WCRC or GMMV, subject to the permitted encumbrances, including patented and unpatented mining and millsite claims, leaseholds, and material easements and rights-of-way of record; and (iv) the other rights and interests in uranium mineralization located in Fremont and Sweetwater Counties, Wyoming owned or held by any of KUC, WCRC or GMMV (collectively, the “Project”).
The consideration for the Acquisition payable at closing of the Stock Purchase Agreement is $175 million in cash, subject to customary working capital adjustments as provided for in the Stock Purchase Agreement, with closing expected to occur in the fourth quarter of calendar year 2024.
Upon completion of the Acquisition, the Company will arrange to replace approximately $25 million in surety bonds securing future reclamation costs relating to the Project. In addition, from and after the completion of the Acquisition the Company and the Buyer shall continue to indemnify the Seller from most of the liabilities associated with the Project.
The closing of the Acquisition is subject to certain conditions customary for an Acquisition of this nature, including that the Wyoming Nuclear Regulator shall have preliminarily approved the application for the transfer of a Radioactive Materials License to the Buyer, and the same shall not have been stayed or enjoined.
The foregoing description of the Stock Purchase Agreement does not purport to be complete and is subject to, and qualified in its entirety by reference to, the Stock Purchase Agreement, which is filed as Exhibit 2.1 to the Company’s Current Report on Form 8-K dated September 23, 2024.
Other subsequent events
Subsequent to July 31, 2024,
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | we received gross proceeds of approximately $55 million from the sale of certain of our investment in equity securities as at September 26, 2024; |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | we sold 110,000 pounds of physical uranium inventory for gross proceeds of $9,062; |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | 1,043,172 share purchase warrants were exercised and proceeds of $3,387 were received; and |
| Column 1 | Column 2 | Column 3 |
|---|---|---|
| ● | we entered into an agreement to sell 100,000 pounds of our physical uranium inventory at a price of $80.25 per pound and with a settlement date on or about October 18, 2024. |
113
Table of Contents